Web Search powered by YAHOO! SEARCH
05.06.2009 3:24 pm

Brentwood at 40 to get repaved

St. Louis Post-Dispatch

The days are numbered for the rumble ride on Brentwood Boulevard near the Highway 40 overpass.

Later this month, crews will lay fresh asphalt on the rough stuff to make the ride much smoother. Warmer nighttime temperatures are necessary. The work won’t…

  • Comments (4)
  • Email this
01.07.2009 2:01 pm

Moving toward normalcy

St. Louis Post-Dispatch

MoDOT’s released its morning rush hour traffic report. Brentwood Boulevard was much better today. Backups were on I-170 at the Forest Park Parway exit. Click here and then scroll down to read it.

  • Comments Off
  • Email this
01.05.2009 1:18 pm

The Brentwood crawl

St. Louis Post-Dispatch

Drivers on Brentwood Boulevard today got a good dose of gridlock. It took twice as long to drive north on Brentwood during morning rush hour than it did before the second closure of Highway 40 (Interstate 64). 

If you plan to take southbound Brentwood home from Clayton  this…

  • Comments (31)
  • Email this