Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 06 Nov 2009 15:25 pm
Were there actually more drivers on I-70 than before? I recall hearing that I-44 had LESS total traffic after the I-64 closure than before the project began.
slykat
Forum User
Joined: 29 Mar 2007
Posts: 165
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 06 Nov 2009 15:29 pm
bprop wrote
Were there actually more drivers on I-70 than before? I recall hearing that I-44 had LESS total traffic after the I-64 closure than before the project began.
I guess that explains it. They ALL used 70. Seriously, my drive times doubled when the second phase of the project started.
I attribute a lot of the problem to the "misuse" of the reversible lanes. Rather than being used like they were designed, in the morning they were used for westbound traffic (out of downtown) and in the evening they were used for eastbound traffic (into downtown). As of right now, they don't even switch. They are always for eastbound traffic.
scdrking2
Forum User
Joined: 10 Feb 2008
Posts: 283
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 06 Nov 2009 15:52 pm
As a regular user of Forest Park PWKY, I will be indeed be thankful.
Attack! Rat
Forum User
Joined: 15 Sep 2007
Posts: 961
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 08 Nov 2009 06:28 am
As the Attack! Rat predicted, pope like gridlock did not grip St. Louis for 2 years.
_________________
bprop
Forum User
Joined: 07 Sep 2003
Posts: 1156
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 08 Nov 2009 07:53 am
^ To be fair, it was predicted and understood by anyone who is honest about how traffic works. This does not include highway engineers and MoDOT, whose livelihoods rely on laying more, more, more pavement
Pol Pothead
Forum User
Joined: 02 Nov 2009
Posts: 47
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 22 Nov 2009 08:56 am
As this nightmare boondoggle nears completion I'm noticing a ton of blacktop being used at connection points on Hanley and Big Bend. Why? They've had two years. Why are they NOT using concrete?
Which would last MUCH longer. Blacktop will get torn up, potholed, rutted.
They've had the roadways closed so they could do it right. Why not actually do it Right? Lay down a good base and then pour high quality concrete?
With the traffic at Hanley/Dale/Eager for instance that blacktop will be beat to hell in 2 years and have to be repaved again! Not to mention all of the exposed seams I'm seeing where of course water will seep down and freeze expand and cause potholes.
Typical half-*ss MoDOT.
But I'm sure Gateway constructor Execs are getting some nice bonuses out of cutting all these corners!
Fozzie
Forum User
Joined: 23 Oct 2005
Posts: 608
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 22 Nov 2009 21:08 pm
If finishing early and under budget means "boondoggle," you'd better let the folks at Webster know about it.
bprop
Forum User
Joined: 07 Sep 2003
Posts: 1156
Post subject: Re: Highway 40 to reopen on 12/7!!!!
Posted: 23 Nov 2009 11:25 am
Fozzie wrote
If finishing early and under budget means "boondoggle," you'd better let the folks at Webster know about it.
Yea, same with the Lambert W1W project.