St. Louis Urbanized Area - - Submitted Projects and Programs
02/15/2009
[American Recovery and Reinvestment Act of 2009
St. Louis Urbanized Area - - Submitted Projects and Programs
|
GRAND TOTAL |
|
|
|
|
CMAQ Program |
|
|
| STATE |
Stimulus $ |
Total $ |
# |
Total $ |
# |
Stimulus $ |
Total $ |
# |
| Illinois |
$241,955,176 |
$258,594,246 |
86 |
$225,215,571 |
68 |
$31,333,675 |
$33,378,675 |
18 |
| Missouri |
$785,711,851 |
$870,416,147 |
256 |
$777,236,200 |
225 |
$92,320,847 |
$93,179,947 |
31 |
| Multi-State |
$19,000,000 |
$19,000,000 |
1 |
$19,000,000 |
1 |
$0 |
$0 |
$0 |
| TOTAL |
$1,046,667,027 |
$1,148,010,393 |
343 |
$1,021,451,771 |
294 |
$123,654,522 |
$126,558,622 |
49 |
|
Projects have not been reviewed for eligiblity , duplication,
or correctness. |
| Source: East-West Gateway Council of
Governments |
| Sponsor |
Project Title |
Location |
Improvement |
Stimulus share |
Total cost |
| Metro |
Illinois Preventive Maintenance - Slope Stability, Erosion, and Retaining
Wall Repairs |
St. Clair County, IL
Project map is attached. |
Transit Capital Imps. <08> |
$3,500,000 |
$3,500,000 |
| Alton |
Fosterburg Road - Phase 3 (FAU Route 9002) |
From 450 feet north of Culp Lane norrly 2,796 feet or 0.53 miles to a point 840 feet south of Illinois Route 255. |
Bi-directional Left-turn Lane <53> |
$1,100,000 |
$1,453,000 |
| Alton |
Fosterburg Road - Culvert Repair (FAU Route 9002) |
This project is located on Fosterburg Road north of Illinois Route 255/ Fosterburg Road Interchange and 560 feet north of
Stutz Lane. |
Culvert <57> |
$185,000 |
$185,000 |
| Alton |
Fosterburg Road - Resurfacing (FAU Route 9002) |
From 100 feet north of Stutz Lane extending north to Drexelius Road a distance of 1,210 feet or 0.23 miles. |
Resurfacing 2 Lane Pvmt <21> |
$184,000 |
$197,000 |
| Belleville |
Royal Heights Road Resurfacing |
Royal Heights Road (FAU 9260) extends norrly from North Belt West (FAU 9257) about 0.60 miles to IL 161 (FAP 805). |
Resurfacing <20> |
$450,000 |
$450,000 |
| Belleville |
West Washington Street/Centerville Avenue Resurfacing |
West Washington Street (FAU 9270) from IL 159 (FAP 600) westerly about 0.32 miles to Centerville Avenue (FAU 9269)
and Centerville Avenue from West Washington Street southwesterly about 0.20
miles to CN Railroad (formerly ICRR). |
Resurfacing 2 Lane Pvmt <21> |
$850,000 |
$850,000 |
| Belleville |
Frank Scott Parkway West |
Frank Scott Parkway West (FAU 9256) from Belleville West Parkway (formerly South 17th St.) sourly about 1.59 miles
to just south of Concordia Church Road. |
Bi-directional Left-turn Lane <53> |
$800,000 |
$1,900,000 |
| Centreville |
Church Road Improvements |
Church Road from IL Route 157 to Mousette Lane |
Resurfacing <20> |
$977,530 |
$977,530 |
| Collinsville |
Bridge Replacement on South Clinton Street (FAU 9134) over Canteen Creek |
Bridge replacement with approach pavement from about 25' north of existing bridge location to about 25' south of
existing bridge location. |
Bridge Removal <38> |
$2,633,000 |
$2,633,000 |
| Collinsville |
Bridge Replacement on Summit Avenue (FAU 9133) over Brush Creek |
Bridge replacement with approach pavement from Johnson Hill intersection (approx. 50' north) to about 50' south of
existing bridge location. |
Bridge Removal <38> |
$818,000 |
$818,000 |
| Collinsville |
Ostle Drive Resurfacing Project |
project will cover improvements to Ostle
Drive from appoximately
50' east of Newport Drive to Waverly Drive. |
Resurfacing 2 Lane Pvmt <21> |
$165,000 |
$165,000 |
| Collinsville |
South Clinton Street Improvement - Phase 2 |
entire project will cover improvements to
South Clinton Street from
Cemetery Street to Illinois Route 159 (FAP 600) (a.k.a. Morrison Avenue).
Phase 2 improvements will be from Lasalle Street to Illinois Route 159. |
Roadway Reconstruction <79> |
$1,270,000 |
$1,270,000 |
| Collinsville |
Spring Street |
Spring Street (FAU 9124) from Lebanon Road (FAU 9127) to Illinois Route 159 (FAP 600), 3,140 feet (0.6 mile). |
Roadway Reconstruction <79> |
$1,000,000 |
$2,725,000 |
| Columbia |
Palmer/Quarry Road Resurfacing |
Palmer Road (FAU 9300)/Quarry Road (FAU 9296) from just east of DD Road to Ghent Road (FAU 9310)/Old IL Route 3
(FAU 9296), approximately 2,400-ft. |
Paving <83> |
$440,000 |
$440,000 |
| East St. Louis |
17th Street Resurfacing |
17th Street from Russell Avenue to Broadway |
Resurfacing 2 Lane Pvmt <21> |
$567,090 |
$567,090 |
| Edwardsville |
Goshen Road Improvements - Phase 3 |
Phase 3 of Goshen Road Improvements will run from end of Phase 2 improvements (about 100 feet east of District
Drive) to 1150' east of District Drive. |
Roadway Reconstruction <79> |
$520,000 |
$520,000 |
| Edwardsville |
Madison Avenue Resurfacing |
norrn terminus of this project is Jefferson
Road, and sourn terminus
of this project is Hadley Avenue. project length is 2,600 feet. |
Resurfacing 2 Lane Pvmt <21> |
$349,000 |
$349,000 |
| Edwardsville |
Schwarz Street Reconstruction |
western terminus is about 200' west of
Fillmore Street, and eastern
terminus is about 200' east of Springer Avenue. project legth is
approximately 1,500 feet. |
Resurfacing 2 Lane Pvmt <21> |
$498,000 |
$498,000 |
| Fairview Heights |
Union Hill Road Resurfacing |
From Lincoln Trail to Longacre Drive |
Resurfacing 2 Lane Pvmt <21> |
$384,000 |
$384,000 |
| Granite City |
Maryville Road (FAU 9080) - Phase 1 |
project begins at intersection of Illinois Route 203 and continues south to intersection of Pontoon Road for a total
distance of 6,206 feet. |
Resurfacing <20> |
$1,352,800 |
$1,352,800 |
| Granite City |
Maryville Road (FAU 9080) - Phase 2 |
project begins on south at intersection of Pontoon Road and continues south to intersection of St. Clair Avenue for
a total distance of 4,628 feet. |
Resurfacing <20> |
$1,148,200 |
$1,148,200 |
| Granite City |
Maryville Road (FAU 9080) - Phase 3 |
project begins on south at intersection of St. Clair Avenue and continues south to intersection of Terminal Avenue
for a total distance of 2,232 feet. |
Resurfacing <20> |
$643,200 |
$643,200 |
| Granite City |
Maryville Road (FAU 9080) - Phase 4 |
project begins at intersection of Terminal Avenue and continues south to intersection of Illinois Route 162 for a
total distance of 3,951 feet. |
Resurfacing <20> |
$983,300 |
$983,300 |
| Granite City |
Mockingbird Lane (FAU Route 9024) |
project begins at intersection of
Stratford Lane and continues south to Alton-Sourn Railroad tracks. This project will also
include a storm sewer outfall along Whippoorwill Lane. project limits for
Whippoorwill Lane are from intersection with Mockingbird Lane east to
Country Place Lane. |
Roadway Reconstruction <79> |
$900,000 |
$900,000 |
| Granite City |
St. Clair Avenue |
project begins at intersection of St.
Clair Avenue and Maryville Road and will continue east approximately 2,323 feet to
intersection with Mockingbird Lane. |
New Roadways <70> |
$1,691,900 |
$1,691,900 |
| Highland |
Iberg Road Reconstruction |
Reconstruct Iberg Road from Broadway (St. Rose Road) to Plocher Way. |
Roadway Reconstruction <79> |
$500,000 |
$1,620,000 |
| Highland |
Koepfli Road Reconstruction Phase 3 |
Reconstruct Koepfli Lane (FAU8841) from Illinois Route 143 (FAP 789) to Pine View Drive. |
Roadway Reconstruction <79> |
$500,000 |
$1,220,000 |
| Highland |
Lindenthal Avenue Resurfacing |
Lindenthal Avenue (FAU 8853) from Washington Street (FAU 8850) to Poplar Street (FAU 8845). |
Resurfacing 2 Lane Pvmt <21> |
$100,000 |
$201,250 |
| Lebanon |
Monroe Street Sidewalks |
St. Louis Street to Horner Park |
Pedestrian Facility <67> |
$418,000 |
$418,000 |
| Lebanon |
St. Louis Street Improvements - Phase 2 |
Horner Street to Monroe Street |
Roadway Improvements <80> |
$615,000 |
$615,000 |
| Madison |
Bissell Street (FAU 9104) Phase 1 |
proposed improvement begins on east of railroad tracks and continues easterly to intersection of Klein Avenue. |
Roadway Reconstruction <79> |
$868,500 |
$868,500 |
| Madison |
Ohio Avenue Pedestrian Walkway |
project begins at Old Madison Road and continues westerly to Illinois Route 203. |
Pedestrian Facility <67> |
$392,000 |
$392,000 |
| O'Fallon, Ill |
Milburn School Road, Phase 4 |
From Old Collinsville Road to Quarter Section Line (2,600 L.F. east of Old Collinsville Road) |
Roadway Reconstruction <79> |
$1,160,500 |
$1,160,500 |
| O'Fallon, Ill |
Old Collinsville Road Improvements |
Frontage Road/Salem Place to Milburn School Road |
Roadway Reconstruction <79> |
$1,114,000 |
$2,921,000 |
| Troy |
Troy - Country Village Estates Frontage Road Overlay Project |
Country Village Estates Frontage Road Overlay project originates at Illinois Route 162 and continues south along
west frontage road of Interstate 55/70 approximately 0.6 miles to its
terminus near City limits of Troy, Illinois. |
Resurfacing 2 Lane Pvmt <21> |
$134,750 |
$134,750 |
| Venice |
Broadway Avenue (FAU 9097) Rehabilitation |
proposed improvement begins at
intersection with Klein Avenue and continues norasterly to intersection of McKinley Avenue. |
Resurfacing 4 Lane Pvmt <23> |
$625,500 |
$625,500 |
| Waterloo |
Lakeview Drive/Park Street Right Turn Lane |
Proposed right turn lane on Lakeview Drive at Park Street (Illinois 156) intersection. Work also includes widening of
Lakeview pavement for right turns from Park Street. |
Right-turn Lanes <54> |
$297,000 |
$330,000 |
| Wood River |
Edwardsville Road |
From Grand Ave. souasterly to 9th Street, a total distance of 1.27 miles. |
Resurfacing 3 Lane Pvmt <22> |
$3,024,000 |
$3,252,000 |
| Wood River |
N. Old St. Louis Road (FAU Route 9005) Phase 1 |
From Old GM&O Crossing Norrly to Grand Ave., a total distance of 0.70 miles. |
Resurfacing 2 Lane Pvmt <21> |
$354,000 |
$384,000 |
| Wood River |
N. Old St. Louis Road (FAU Route 9005) Phase 2 |
From Madison Ave. (IL Route 143, FAP 789) Norrly to Old GM&O Crossing, a total distance 0.38 miles. |
Roadway Reconstruction <79> |
$1,047,000 |
$1,203,000 |
| Wood River |
South 6th Street |
From Rohm Pl. norrly to Madison Ave. (IL Route 143, FAP 789), a total distance 0.5 miles. |
Resurfacing 2 Lane Pvmt <21> |
$255,300 |
$277,300 |
| Metro East Park and Recreation District |
MEPRD - Malcolm W. Martin Park Multipurpose Visitor Facility |
project entails construction of a
Multipurpose Visitor Facility at Malcolm W. Martin Park in East St. Louis, Illinois. facility
will be located at end of Confluence Bikeway Central Trail, and
origination of Confluence Bikeway South Trail. This places facility
approximately 1000 feet south of Metrolink East Riverfront Station. |
Miscellaneous <90> |
$3,700,000 |
$3,700,000 |
| Southern Illinois University Edwardsville |
University Park Drive & North Research Drive |
University Park Drive extends easterly from Research
Drive to IL 157.
North Research Drive begins 820' north of University Park Drive and extends
norrly to P3 Drive. |
Resurfacing <20> |
$440,000 |
$840,000 |
| Southwestern Illinois Development Authority |
Port of East St. Louis |
project will be situated on Mississippi
Riverfront along sourn tip of East St. Louis and norrn tip of Sauget, Illinois, running
from just north of MacArthur Bridge to Cahokia Marine Service terminal,
comprising approximately 300 acres. |
Miscellaneous <90> |
$133,500,000 |
$133,500,000 |
| St. Clair County |
Concordia Church Road |
Beginning at a point approximately 250 feet
West of intersection
with Il Route 158. nce continuing West 0.87 miles to intersection with
Frank Scott Parkway West. |
Roadway Reconstruction <79> |
$1,750,000 |
$2,014,500 |
| St. Clair County |
Archview Drive |
Commencing at a point near intersection of I255 and Mousette Lane; nce continuing souasterly to Il Route 157. |
New 2-Lane Roadway <72> |
$4,020,800 |
$4,723,920 |
| St. Clair County |
North Greenmount Road |
North Greenmount Road from 400 ft South of Route I-64 Eastbound ramps at North Greenmount Road/I-64 Interchange,
Norrly 0.54 mile. |
Widening 3 to 5 Lanes <15> |
$1,493,613 |
$1,766,613 |
| Washington Park |
Audubon Avenue Street Improvement |
Audubon Avenue (46th Street to Vassar Avenue) |
Roadway Improvements <80> |
$1,520,000 |
$1,520,000 |
| Washington Park |
Hill Avenue Street Improvement |
Hill Avenue (Kingshighway Boulevard to Vassar Avenue) |
Roadway Improvements <80> |
$420,500 |
$420,500 |
| Washington Park |
Vassar Avenue Street Improvement |
Vassar Avenue (Hill Avenue to Bunkum Road) |
Roadway Improvements <80> |
$2,850,000 |
$2,850,000 |
| Tri-City Regional Port District and Madison County |
Levee Road Rehabilitation |
project begins at intersection of 20th Street and continues north to intersection of North Street for a total
distance of 6,500 feet. |
Resurfacing 2 Lane Pvmt <21> |
$896,800 |
$896,800 |
| Bethalto |
West Corbin Extension (Phase III) |
Beginning at west approach of SN: 060-6851 (Sta. 37+70.95) and terminating at IL 140/111 (Sta. 82+54.97). |
New 2-Lane Roadway <72> |
$5,000,000 |
$5,000,000 |
| Cahokia |
Doris Avenue Resurfacing |
Doris Avenue from Range Lane to Jerome Lane |
Resurfacing 2 Lane Pvmt <21> |
$409,000 |
$409,000 |
| East Alton |
St. Louis Avenue Roadway Improvements FAU Route 8980 |
From West Main St. easterly 4,910 ft. (0.93 miles)
to Haller Ave. which is at Village limits.
|
Resurfacing <20> |
$1,905,000 |
$1,905,000 |
| East Alton |
Main Street Improvements (FAU Route 8967) |
From St. Louis Avenue (FAU Route 8980) easterly 0.62 miles to Lakeside Avenue. |
Resurfacing <20> |
$1,095,500 |
$1,095,500 |
| Fairmont City |
Mounds Heritage Trail/Fairmont City Street Improvements |
Starting at intersection of Collinville Rd. and
Cookson Rd.,
East on Cookson Rd. 0.55 miles to N. 45th St.,
North on 45th St. 0.39 miles to Maryland Ave.,
East on Maryland Ave. 1.11 miles to N 63rd St.,
North on 63rd St. 0.50 miles
to intersection with Collinsville Rd. |
Preliminary Engineering <50> |
$2,774,762 |
$2,774,762 |
| Glen Carbon |
Glen Carbon Road Pavement Preservation, Phase 1 |
Beginning at IL Route 157 eastward to S. Meridian Road intersection. |
Resurfacing 2 Lane Pvmt <21> |
$387,200 |
$387,200 |
| Glen Carbon |
Glen Carbon Road Pavement Preservation, Phase 2 |
Beginning at S. Meridian Road intersection to approx. 150' north of Glen Crossing/Meridian Road intersection. |
Resurfacing 2 Lane Pvmt <21> |
$223,000 |
$223,000 |
| Godfrey |
Crosstown Road-Phase 1 (FAU 8904) |
project is located in Godfrey in Madison County, Illinois. project begins at Airport Road/ Pierce Lane intersection and
extends easterly to a point 673 feet east of US Route 67 (Godfrey Road) on
Ill. Route 111 (Montclair Ave.) a total length of 8,890.07 feet or 1.68
miles. |
New 2-Lane Roadway <72> |
$750,000 |
$5,973,000 |
| Godfrey |
Stamper Lane - Phase 2 (FAU 8950) |
From 900 feet west of Illinois Route 111/US Route 67 westerly for 2,100 feet (0.40 miles) to a point 3,950 feet (0.75
miles) east of Pierce Lane. |
Roadway Reconstruction <79> |
$800,000 |
$979,000 |
| Hartford |
North Old St. Louis Road |
North Old St. Louis Road from Hawthorne St. north to Rand Ave., a total distance of 0.5 miles. |
Roadway Reconstruction <79> |
$354,500 |
$384,500 |
| Maryville |
Lakeview Acres Phase 2 (F.A.U. Route 9114) |
project begins just south of intersection with Illinois Route 162 and continues south to termini of Phase 1, just north
of Remington Lane. |
Roadway Reconstruction <79> |
$1,313,500 |
$1,313,500 |
| Maryville |
Lakeview Acres Road Phase 3 (F.A.U. Route 9114) |
This project is located at intersection of Lakeview Acres Road and Illinois Route 162. Approximately 220' of
improvements on both sides of intersection will be reconstructed along
Lakeview Acres Road. Approximately 400' of improvements on both sides of
intersection will be reconstructed along Illinois Route 162. |
Intersection Reconstruction <49> |
$1,164,200 |
$1,164,200 |
| Pontoon Beach |
Pontoon Road Resurfacing Project (FAU Route 9082) |
160 feet west of Breckenridge Lane easterly 2,837 feet or 0.54 miles to Illinois route 111 |
Resurfacing 3 Lane Pvmt <22> |
$279,500 |
$392,700 |
| Shiloh |
Shiloh Station Road Improvements |
Shiloh Station Road, from Shiloh Main Street/Lebanon Avenue South for approximately 1.52 miles to Village limits.
Project Map see Exhibit 1. |
Drainage Correction <82> |
$4,223,684 |
$4,223,684 |
| Swansea |
IL Rte. 159 Pedestrian Way Improvements |
IL Rte. 159, from Fullerton Road (Colleen Drive-private drive) to West J Street (south city limit) |
Sidewalks <88> |
$554,927 |
$554,927 |
| Swansea |
Fullerton Road Bi-directional Turn Lane |
Fullerton Road, from IL Rte. 159 to 2,000 feet west (at Metrolink overpass) |
Bi-directional Left-turn Lane <53> |
$771,000 |
$771,000 |
| Swansea |
Huntwood Road Improvements-Phase 2 |
Huntwood Road, from Old Caseyville Road to IL Rte. 159 |
Roadway Reconstruction <79> |
$3,208,445 |
$3,208,445 |
| Metro |
Phase I MetroLink Infrastructure Rehabilitation - Stations &
Right-Of-Way |
East St. Louis, IL - St. Louis City, MO - St. Louis
County, MO
Project map is attached. |
Transit Capital Imps. <08> |
$12,000,000 |
$12,000,000 |
| Cities of: Festus, Crystal City, Herculaneum, Pevely |
4CRISP (4-Cities Road Improvement Stimulus Project) |
On north side Highway 61-67 from Highway Z, south to Interstate 55, also including Highway Z from Metropolitan Blvd.
to Highway 61/67, and McNutt Road from I-55 to Highway 61/67. |
Add Auxilliary Lane <05> |
$0 |
$0 |
| Ballwin |
Kehrs Mill Road Pavement Replacement |
Holloway Road to Clayton Road. |
Resurfacing 2 Lane Pvmt <21> |
$1,330,000 |
$1,330,000 |
| Brentwood |
Litzsinger Road Rehabilitation |
limits of this project are Litzsinger Road
in Brentwood, Missouri
between McKnight Road and Brentwood Boulevard as shown in Appendix A. |
Resurfacing 2 Lane Pvmt <21> |
$1,150,000 |
$1,150,000 |
| Bridgeton |
Fee Fee Road Improvement Project |
Fee Fee Road - Old St. Charles Rock Road to Ayrshire
Drive
A project map will be submitted with supplemental information. |
Roadway Reconstruction <79> |
$1,729,699 |
$1,863,675 |
| Chesterfield |
Appalachian Trail Street Reconstruction - Phase I |
project is located on Appalachian Trail between Olive Boulevard and Beaver Creek Drive. |
Roadway Reconstruction <79> |
$986,425 |
$986,425 |
| Chesterfield |
Appalachian Trail Street Reconstruction - Phase II |
project is located on Appalachian Trail between Beaver Creek Drive and White Road. |
Roadway Reconstruction <79> |
$1,089,490 |
$1,089,490 |
| Chesterfield |
North Outer 40 |
Center Turn Laneproject is located on North Outer 40, just east of Spirit of
St. Louis Boulevard, adjacent to Chesterfield Valley
Athletic Complex. |
|
$0 |
$0 |
| Chesterfield |
O live Street Road and Chesterfield Airport Road Improvements project is located at intersection of Olive Street Road and Chesterfield Airport Road. |
Roadway Improvements <80> |
|
$4,687,782 |
$4,687,782 |
| Chesterfield |
Schoettler Valley Drive Street Reconstruction |
project is located on Schoettler Valley
Drive between Highcroft
and Chesterfield Parkway East. |
Roadway Reconstruction <79> |
$517,975 |
$517,975 |
| Cool Valley |
South Florissant Road Streetscape Improvements |
South Florissant Road from Signal Hill north to City Limits |
Streetscape Improvements <02> |
$653,725 |
$653,725 |
| Cottleville |
Gutermuth Realignment |
Gutermuth Realignment project is, what we
consider, Phase III of
St. Charles County - Gutermuth Reconstruction project. first phase is being
constructed by St. Charles County, second phase has been designed and
preparing to begin construction by St. Charles County, and third phase
(realignment) is being designed at this time by Cottleville. realignment
project is proposing a new widened and elevated alignment north from
existing location of Gutermuth Road. See Appendix A for location map
showing project limits. |
Roadway Realignment <71> |
$3,898,708 |
$3,898,708 |
| Crestwood |
Spellman Road Corridor Improvements |
project will begin at intersection of
Rayburn Avenue and Spellman
Road, and will continue norrly to and including intersection of Pinellas
Drive and Ponderosa Drive, n norrly to and including intersection of Acorn
Drive and Oak Ridge, n to and including intersection with Oak Ridge and
South Holmes Avenue, n to South Right of Way of Big Bend Road, where it will
match existing pavement. This compliation of streets shall be known as
Spellman Road Corridor Improvements, collectively. (See Appendix A - Project
Location Maps) |
Roadway Reconstruction <79> |
$2,978,000 |
$2,978,000 |
| Creve Coeur |
Olive Blvd. Phase II Improvements |
This project addresses various improvements from Olive/Mason Rd. to Olive/Old Ballas Rd. (see project location map) |
Widening <10> |
$6,146,750 |
$6,146,750 |
| Creve Coeur |
Olive Boulevard Access Management and Safety Upgrades |
project includes relocation of Dautel Lane
from Olive Boulevard to
Greaser Acres as well as Olive Boulevard from just west of Schulte Road to
just west of Deaver Lane/Chase Park Lane. Projects limits are graphically
illustrated on Exhibit 1 within supplemental packet of information. |
Roadway Realignment <71> |
$3,137,943 |
$3,137,943 |
| Crystal City |
11th and Mississippi Road Improvements |
11 Avenue … Missouri Avenue to Mississippi
Avenue
Mississippi Avenue … 11th Avenue to 8th Avenue
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$1,334,631 |
$1,488,187 |
| Crystal City |
Crystal City Heights Road Resurfacing Project |
Crystal City Heights Road - Missouri Avenue to
Commercial Boulevard
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$411,980 |
$439,069 |
| Dardenne Prairie |
Hanley Road Reconstruction |
This project is located north of Feise Road along
Hanley Rd for about 2300 feet +/-.
(See Exhibit 1 in Appendix A.) |
Roadway Reconstruction <79> |
$1,198,000 |
$1,198,000 |
| Dardenne Prairie |
Post Road Intersection Realignment |
This project proposes to realign Post Road with Hanley Road at Highway N in St. Charles County, Missouri . See Appendix
A for project location and layout. |
Roadway Realignment <71> |
$511,000 |
$511,000 |
| De Soto |
De Soto Industrial Park |
See Attached |
|
$0 |
$0 |
| Des Peres |
Highland Avenue Bridge Replacement over Sugar Creek (MoDOT #1145005) |
bridge is located on Highland Avenue approximately 0.20 miles south of Dougherty Ferry Road and 0.10 miles west of
I-270. (See map). |
Replace Bridge(s) <33> |
$985,000 |
$985,000 |
| DeSoto |
Amvets Drive Improvement Project |
Amvets Drive - Main Street to Hwy 21
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$940,524 |
$987,550 |
| DeSoto |
Boyd Street Improvement Project |
Boyd Street - Main Street to N. Thomas Drive
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$1,393,384 |
$1,499,142 |
| Edmundson |
Local Street Sidewalk Improvements |
Construct new sidewalks on folllowing City streets:
Holman, Mortimer, St. Girard, St. Jerome, Beauty, Traverse, Heath, Mill
Pass, Treadway, Charm, Tanbark, Crilly, Dabney, and Dothan
See attached Exhibit 1 - Location Map. See Exhibits
2 and 3 for project details and Exhibit 4 for photos. |
Pedestrian Facility <67> |
$100 |
$100 |
| Ellisville |
Ellisville Street Improvement Projects |
re are four streets that will be improved. A project map is included with supplemental information that identifies four
locations. four locations are 1) Hutchinson Road; Manchester Road to Clayton
Road 2) Pierside Road; Old State Road to Kiefer Creek Road 3) Strecker
Road; Manchester Road to north of SunnyRidge Road (Ellisville City Limits)
and 4) Reinke Road; Manchester Road to south of Palm Bay Road. |
Resurfacing 2 Lane Pvmt <21> |
$1,348,184 |
$1,348,184 |
| Eureka |
Eureka Alternative Transportation Improvements |
See Attached Maps. |
Transit Improvements <69> |
$1,774,800 |
$1,874,800 |
| Eureka |
Eureka Overpass |
project location is in southwest quadrant of City, immediately south of Six Flags Road/I-44 Interchange. This project
will begin on south side of interchange and extend south over all three
sections of existing and relocated rail lines. exact location is shown in
Appendix A. |
Bridge Removal <38> |
$14,000,000 |
$14,000,000 |
| Fenton |
Gravois Road Improvements - Saline Road to Meramec River Bridge |
Gravois Road will be resurfaced from Saline Road to
Meramec River Bridge, approximately 1.3 miles with modifications to two
intersections.
project map is attached as Exhibit 1. |
Resurfacing 5 Lane Pvmt <24> |
$1,145,000 |
$1,145,000 |
| Fenton |
Larkin Williams and Yarnell Road Improvements |
project will extend along Yarnell
Road from I-44 south to a location where Yarnell Road ties into Larkin
Williams Road, n project continues on Larkin Williams Road to Highway
30.
project map is attached as Exhibit 1. |
Resurfacing 3 Lane Pvmt <22> |
$2,908,000 |
$2,908,000 |
| Fenton |
Old Highway 141 Resurfacing and Addition of Continuous, Two-Way Left Turn
Lane and Shoulders |
Old Highway 141 will be improved for portion
between Gravois Road and Gravois Bluffs Boulevard and this project covers
0.25 miles of that segment. This improvement includes roadway widening and
addtion of a continuous two-way turn lane. A portion of road surrounding a
bridge being replaced over Fenton Creek is excluded from this
application.
project limits are shown on Exhibit 1. |
Bi-directional Left-turn Lane <53> |
$407,415 |
$407,415 |
| Fenton |
Roadway Concrete Slab Replacement - Fenton Industrial Complex |
slabs to be replaced are located
in Fenton Industrial Complex.
project map is attached as Exhibit 1. |
Roadway Improvements <80> |
$3,027,000 |
$3,027,000 |
| Ferguson |
Sidewalk Replacement Project |
Ferguson |
Pedestrian Facility <67> |
$128,000 |
$128,000 |
| Festus |
Central Avenue Road Improvement Project |
Central Avenue - N. Mill Street to Horine Road
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$888,027 |
$955,558 |
| Gerald |
Flottmann Road |
This project consists of pavement repair, pavement overlay, and curb and gutter repair for a portion of Flottmann Road
located in Gerald, Missouri. project length is approximately 1,456 feet
long and begins at intersection of W. Industrial Drive and extends east to
east entrance of Newly Weds Foods factory. (See Project Map) |
Resurfacing 2 Lane Pvmt <21> |
$51,290 |
$51,290 |
| Gerald |
Haase Drive |
This project consists of pavement repair, pavement overlay, and new curb and gutter for entire length of Haase Drive
located in Gerald, Missouri. street is approximately 550 feet long and
begins at Missouri State Highway 50 and extends north to E. Industrial Drive.
See attached Project Map (Exhibit "A") |
Resurfacing 2 Lane Pvmt <21> |
$61,615 |
$61,615 |
| Gerald |
Industrial Drive |
This project consists of pavement repair, pavement overlay, and new curb and gutter for Industrial Drive located in
Gerald, Missouri. street is approximately 4,545 feet long and begins at
Haase Drive and extends west to Flottmann Road. See attached Project Map
(Exhibit "A") |
Resurfacing 2 Lane Pvmt <21> |
$184,320 |
$184,320 |
| Gerald |
Industrial Drive Extension |
This project consists of approximately 2,050 feet of new street construction that will connect Industrial drive to
Missouri State Route 50. This connection will provide a loop through
Industrial park and all residential areas intersecting Industrial drive.
See attached Project Map (Exhibit "A") |
New 2-Lane Roadway <72> |
$572,875 |
$572,875 |
| Hazelwood |
Burke City Phase 3 |
Former Burke City area of Hazelwood, bounded on east by Calverton Park, on north by Florissant, on south by
Berkeleyand on west by Moran Drive. |
Resurfacing <20> |
$500,000 |
$500,000 |
| Hazelwood |
Cedar Brooke Sidewalks |
Missouri Bottom Road & Leafcrest Drive on north, Tulip Tree Lane on west, Cherry Blossom Lane on east and Hwy 370
on south. |
Sidewalks <88> |
$575,000 |
$575,000 |
| Hazelwood |
Concrete Slab Replacement |
City Wide |
Miscellaneous <90> |
$1,500,000 |
$1,500,000 |
| Hazelwood |
Fee Fee Road Reconstruction |
From McDonnell Blvd. to Lambert Pointe |
Roadway Improvements <80> |
$1,300,000 |
$1,300,000 |
| Hazelwood |
Frost-Byassee Connection |
From Eva Ave. in Berkeley to McDonnell Blvd. in Hazelwood |
New 2-Lane Roadway <72> |
$1,650,000 |
$1,650,000 |
| Hazelwood |
Infill Sidewalks |
Bounded by Interstate 270 on south, Houdershell on west, Florissant city limits on north and east. |
Pedestrian Facility <67> |
$2,500,000 |
$2,500,000 |
| Hazelwood |
Installation of Lighted Street Name Signs |
Along Lindbergh Blvd., McDonnell Blvd. and St. Louis Mills Blvd. |
Intersection Improvement <40> |
$200,000 |
$200,000 |
| Hazelwood |
Railroad Bridge Replacement |
Lindbergh Blvd. at Hazelwood - Bridgeton city limits |
Replace Bridge(s) <33> |
$35,000,000 |
$35,000,000 |
| Hazelwood |
Replace Interchange at Lindbergh Blvd. and Interstate 270 |
Lynn Haven on north, Utz Lane on south, 1000 feet from intersection on east and west |
Interchange Revision <96> |
$40,000,000 |
$40,000,000 |
| Hazelwood |
Sidewalk Repairs |
City wide |
Pedestrian Facility <67> |
$300,000 |
$300,000 |
| Hazelwood |
Street Reconstruction |
City wide |
Roadway Improvements <80> |
$2,000,000 |
$2,000,000 |
| Herculaneum |
Brown Street Improvement Project |
Brown Street - Joachim Avenue to Main Street
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$959,405 |
$1,041,701 |
| Hillsboro |
Old Highway 21 Road Improvement Project |
Old Highway 21 … Hwy B to Maple Street
A project map will be submitted with supplemental information. |
Pedestrian Facility <67> |
$1,237,776 |
$1,317,623 |
| Jennings |
College Avenue Street Replacement |
Removal and replacement 1685 linear feet of streets and curbs/gutters. Remove 630 linear feet of old sidewalk. |
Roadway Reconstruction <79> |
$700,000 |
$700,000 |
| Jennings |
Cozens Avenue Street Replacement |
Removal and replacement 1360 linear feet of streets, curbs/gutters and sidewalks. |
Roadway Reconstruction <79> |
$600,000 |
$600,000 |
| Jennings |
Emma Avenue Street Replacement |
Removal and replacement 1275 linear feet of streets, curbs/gutters and sidewalks. |
Roadway Reconstruction <79> |
$550,000 |
$550,000 |
| Jennings |
Paratransit Replacement |
see attached map of city layout |
|
$85,000 |
$85,000 |
| Kirkwood |
Kirkwood Street Infrastructure Project |
|
|
$0 |
$0 |
| Ladue |
Ladue Pavement Rehabilitation |
McKnight Road from Clayton Road to Ladue Road
Litzsinger Road from Warson Road to McKnight Road
Old Warson Road from Warson Road to McKnight Road |
Resurfacing 2 Lane Pvmt <21> |
$1,179,720 |
$1,179,720 |
| Ladue |
Ladue Sidewalks and Walls |
|
|
$0 |
$0 |
| Ladue |
Warson Road Improvements - Phase 2 |
Warson Rd. between Conway Rd. and Clayton Rd.
See supplemental information for location map.
|
Resurfacing 2 Lane Pvmt <21> |
$378,049 |
$378,049 |
| Ladue |
Warson Road Improvements - Phase 3 |
Warson Rd/Woodlawn Ave. form Clayton Rd. to sourn
City Limits
See supplemental information for project map.
|
Resurfacing 2 Lane Pvmt <21> |
$966,858 |
$966,858 |
| Lake Saint Louis |
ARRA Overlay Program 2009 |
1. Ronald Reagan Drive from Green Tree Meadows Dr.
to Lake Saint Louis Boulevard.
2. Lake Saint Louis Boulevard from Veterans Memorial Drive to Spillway
Bridge.
3. Prospect Rd. from Corporate Parkway to Freymuth Rd.
|
Resurfacing <20> |
$500,911 |
$500,911 |
| Manchester |
Asphalt street milling and overlay project |
See attached City map. |
Paving <83> |
$240,000 |
$240,000 |
| Manchester |
Asphalt street milling and overlay project |
See attached City Map |
Paving <83> |
$280,000 |
$280,000 |
| Manchester |
Concrete sidewalk replacement |
See attached City map. |
Pedestrian Facility <67> |
$90,000 |
$90,000 |
| Manchester |
Concrete sidewalk replacement |
See attached City Map. |
Pedestrian Facility <67> |
$100,000 |
$100,000 |
| Manchester |
Concrete street replacement |
See attached map. |
Roadway Improvements <80> |
$720,000 |
$720,000 |
| Manchester |
Concrete street replacement |
See attached map |
Roadway Improvements <80> |
$760,000 |
$760,000 |
| Manchester |
Schroeder Park storm sewer and drainage improvements. |
See attached city map. |
Culvert <57> |
$0 |
$0 |
| Manchester |
Structural Rehabilitation of Bridges |
6 Manchester owned and maintained bridges located within City limits. See attached map. |
Rehabilitate Bridges(s) < 32> |
$240,000 |
$240,000 |
| Maplewood |
Maplewood Sidewlk Repair/Construction |
City-wide |
Sidewalks <88> |
$100 |
$100 |
| Maryland Heights |
Concrete Street Reconstruction |
Pheasant Run (Charterwood-Dorsett), Wesglen Estates Drive (Wesco-Wesmeade), Donny Cave (Forestel Ct-North City
Limits), Glenpeak Drive (Glenette-Glenlea), Glenette Drive
(Glenlea-Glenpeak), Country Run Ct (Sar-end), Village Glen Ct (Sar-end),
Villager Park Ct (Meadow Park Ct-End), Meadow Park Ct (Bennington-end),
Glenmeade Dr (Dawn Hill-Glenbush), Glenbush Dr (Glenmeade-Roth Hill) |
Roadway Reconstruction <79> |
$2,900,000 |
$2,900,000 |
| New Haven |
Miller Street Reconstruction Phase 2 |
Project involves reconstruction of Miller Street from intersection with Highway 100 north approximately 3,600 linear
feet (.68 miles). |
Roadway Reconstruction <79> |
$2,070,981 |
$2,070,981 |
| Normandy |
Natural Bridge Great Streets Project (Phase 1 Construction) |
See Attached Map |
Streetscape Improvements <02> |
$12,369,000 |
$12,369,000 |
| O'Fallon, Mo. |
2009 Resurfacing Project |
This project will provide a 2" overlay on
following streets:
Route M (Main Street): Interstate 70 to north of Third Street (terminate at
concrete)
East Pitman Street: Route M (Main Street) to Sonderen
Sonderen: Wabash Avenue to
north of Interstate 70 (terminate at concrete) |
Resurfacing <20> |
$670,000 |
$670,000 |
| O'Fallon, Mo. |
Feise Road Bike Path Addition |
Feise Road, from Missouri Highway 'K' to Bryan Road; a distance of 2.25 miles. Currently Feise is a 3-lane road with
sidewalks along south side. It serves primarily residential subdivisions and
trailer parks throughout. |
Bicycle Facilities <58> |
$260,000 |
$260,000 |
| O'Fallon, Mo. |
Highway 79 West Frontage Road |
Highway 79 is a Missouri State Highway that runs north-south
adjacent to O'Fallon. |
Proposed western frontage
road to Highway 79 would be from T.R. Hughes Blvd to Old Highway 79. |
$3,250,000 |
$3,250,000 |
| O'Fallon, Mo. |
I-64 South Outer Road (Millennium Boulevard) |
Millennium Boulevard from Highway DD to Kent Drive: Millennium Boulevard will serve as outer road on south side of
Interstate 64. project will provide a new four lane road that will connect
Highway DD and Highway N. This project should relieve traffic between
Winghaven & Hwy N interchanges on I-64 and create furr access to
High-Tech corridor. |
New 4-Lane Roadway <73> |
$3,650,000 |
$8,200,000 |
| O'Fallon, Mo. |
I-70 / Highway K Interchange |
I-70 / Highway K Interchange is main
interchange on Interstate
70 within O'Fallon. interchange is severely congested and is in dire need
of a revision. See attached location/concept map. |
Feasibility/Planning Study <56> |
$1,000,000 |
$1,000,000 |
| O'Fallon, Mo. |
Main Street Traffic Signal Upgrades and Interconnect |
Main Street is a north/south street that starts at I-70. limits of this project are from West/East Terra to MO State
Highway P; a total distance of 1.80 miles. Intersections as part of this
application are as follows: West Terra, Pitman, Church, Elm, Third, St.
Joseph, Tom Ginnever, and Highway P. |
Traffic Signals <42> |
$720,000 |
$720,000 |
| O'Fallon, Mo. |
Veterans Memorial Parkway Widening |
Veterans Memorial Parkway is a minor arterial and is outer road on south side of Interstate 70. project extends
from Highway K (exit 217) to Sonderen and will reconstruct and widen Veterans
Memorial Parkway from two to three lanes. |
Widening 2 to 3 Lanes <12> |
$1,500,000 |
$1,500,000 |
| O'Fallon, Mo. |
West Terra Widening (East of Bryan Road) |
West Terra is outer (service) road for I-70 along north side. section for this project will overlay and widen West
Terra from North Central Drive to Bryan Road (exit 216 along I-70); a total
distance of 0.4 miles. |
Widening <10> |
$501,000 |
$501,000 |
| O'Fallon, Mo. |
West Terra Widening (West of Bryan Road) |
West Terra is outer (service) road for I-70 along north side. section for this project will overlay and widen West
Terra from Bryan Road (exit 216 along I-70) to Lake St. Louis Blvd (exit 214
along I-70); a total distance of 2.06 miles. |
Widening <10> |
$2,060,000 |
$2,060,000 |
| Pacific |
Congress Street Improvement Project |
Congress Street (Hwy N) - from 4th Street to Indian
Trail Road
A project map showing project limits will be submitted with supplemental
information.
|
Sidewalks <88> |
$1,396,764 |
$1,511,664 |
| Pacific |
Denton Road Bridge Replacement Project |
Bridge along Denton Road, over
Brush Creek, just south of W. Watson.
A project map showing project limits will be submitted with supplemental
information. |
Construct Bridge(s) <34> |
$963,676 |
$1,074,517 |
| Pacific |
W. Osage Street Improvement Project |
W. Osage Street - from Indian Warpath Drive to N.
7th Street
A project map showing project limits will be submitted with supplemental
information. |
Pedestrian Facility <67> |
$782,500 |
$846,038 |
| Pagedale |
Page Avenue Streetscape Improvements - Phase II |
Pennsylvania Avenue eastward to City Limits |
Streetscape Improvements <02> |
$1,727,728 |
$1,727,728 |
| Richmond Heights |
Dale Avenue Great Streets Project |
|
Streetscape Improvements <02> |
$3,210,000 |
$3,210,000 |
| Rock Hill & Glendale |
Bismark Avenue Improvements |
project extends westwardly from Rock Hill
Road to Berry Road.
portion maintained by Rock Hill extends from Rock Hill Road to Barron Lane.
portion of Bismark maintained by Glendale extends from Barron Lane to Berry
Road. |
Roadway Improvements <80> |
$2,788,052 |
$2,788,052 |
| St. Ann |
Breckenridge Ave. Mill and Overlay |
Ashby Rd. to City Limits (east) |
Resurfacing 3 Lane Pvmt <22> |
$244,700 |
$244,700 |
| St. Ann |
Breckenridge Ave. Mill and Overlay |
Ashby Rd. to City Limits (east) |
Resurfacing 3 Lane Pvmt <22> |
$244,700 |
$244,700 |
| St. Charles |
Boschertown Road Phase I |
Boschertown Road: Foxhill Road to approximately 2100
feet north (by National Cart)
Foxhill Road: Intersection of Boschertown Road to 530 feet east |
Roadway Reconstruction <79> |
$3,270,700 |
$3,270,700 |
| St. Charles |
New Town Boulevard Reconstruction |
New Town Boulevard from 180 feet north of Elm Point Industrial Drive to 520 feet north of New Town Drive. |
Widening 2 to 3 Lanes <12> |
$4,625,000 |
$5,275,000 |
| St. Charles |
South Main Street South |
South Main Street from 350 feet south of Ameristar Blvd to South River Road. |
Roadway Reconstruction <79> |
$3,865,180 |
$3,865,180 |
| St. Clair |
Springfield Avenue Road Improvement Project |
Springfield Avenue - Main Street to City Limit
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$1,462,269 |
$1,911,759 |
| St. Clair |
St. Clair Mo Route 30 Roadway Improvements |
This project consists of roadway and pedestrian
improvements along Highway 30 between Bardot and High School Drive in St.
Clair, Missouri. following exihibits are provided in Appendix A that
provide greater depiction of project:
(see Appendix A - Exhibit 1 -
"Projects Limits Map", Sheets 1-4 "Concept Plans" &
"Engineer's Cost Estimate")
|
Bi-directional Left-turn Lane <53> |
$876,500 |
$1,105,000 |
| St. Louis |
Bridge Maintenance and Management Plan … Off System Bridges |
All 24 St. Louis owned and maintained Off-System Bridges on local routes within City Limits. See attached map. |
Rehabilitate Bridges(s) < 32> |
$3,315,400 |
$4,325,000 |
| St. Louis |
Bridge Maintenance and Management Plan … On System Bridges |
All 47 St. Louis owned and maintained On-System Bridges on federal Aid routes within City Limits. See attached map. |
Rehabilitate Bridges(s) < 32> |
$4,527,000 |
$8,475,000 |
| St. Louis |
Carrie Avenue Improvements, N. Broadway to Hall |
Carrie Avenue from North Broadway Street to Hall Street |
Roadway Reconstruction <79> |
$3,000,724 |
$3,000,724 |
| St. Louis |
Grand Boulevard Viaduct Reconstruction |
Grand Boulevard between Chouteau and I-64/US 40 ramps. |
Replace Bridge(s) <33> |
$4,780,000 |
$24,985,001 |
| St. Louis |
Hall Street Improvements |
Hall Street, located in City's North
Riverfront:
2.2 miles long, ROW mostly 120', some areas have 80' ROW
south end at East Grand (4600 Hall), north end at Gimblin (8400
Hall)
See attached maps and photos.
|
Drainage Correction <82> |
$9,317,879 |
$9,317,879 |
| St. Louis |
Interstate 70 / Goodfellow Streetscape Improvements |
Goodfellow Boulevard between Interstate 70 and Natural Bridge Avenue |
Streetscape Improvements <02> |
$4,243,539 |
$4,243,539 |
| St. Louis |
Loop Trolley Construction |
Delmar Boulevard, from Trinity Avenue in University City to DeBalievere Avenue, n south along DeBaliviere to Missouri
History Museum |
Transit Capital Imps. <08> |
$40,000,000 |
$40,000,000 |
| St. Louis |
North Sarah Street Improvements (Belle to Page) |
|
Intersection Improvement <40> |
$1,250,000 |
$1,250,000 |
| St. Louis |
Reconstruction of Tucker Boulevard - O'Fallon to Cass |
This project extends along Tucker from its
intersection with O'Fallon Ave through its intersection with Cass Ave,
veering east through old Schnucks parking lot to align with proposed New
Mississippi River Bridge St. Louis ramps.
approximate length along
project is 1500 feet. |
Geometric Revisions <46> |
$1,141,064 |
$6,245,064 |
| St. Louis |
Reconstruction of Tucker Boulevard Bridge |
This project extends along Tucker from its
intersection with Washington Avenue through its intersection with
OFallon Ave, n veering east through old Schnucks parking lot to align
with proposed New Mississippi River Bridge St. Louis ramps.
approximate length along project is 4000 feet. project will also extend
down cross streets approximately 100 ft and encompasses Interco plaza,
streets surrounding St. Patricks Center, and depressed area north of
O |
Bridge Removal <38> |
$27,146,000 |
$32,250,000 |
| St. Louis |
Road Preservation and Pedestrian Improvements - Project "A" |
Project involves infrastructure improvements on
following arterials as shown on Project Map included in Appendix:
Skinker Boulevard from Clayton Road to Page Boulevard (Principal
Arterial)
Goodfellow Boulevard from Delmar Boulevard to Natural Bridge
Avenue (Minor Arterial)
Broadway from Chouteau Avenue to Convention Plaza (Principal Arterial)
Fourth Street from Chouteau Avenue to Convention Plaza (Principal Arterial) |
Resurfacing <20> |
$5,150,000 |
$5,150,000 |
| St. Louis |
Road Preservation and Pedestrian Improvements - Project "B" |
Project involves infrastructure improvements on
following arterials as shown on Project Map included in Appendix:
Grand Boulevard from Holly Hills Avenue To Natural Bridge Avenue (Principal
Arterial)
North Florissant Avenue from Palm Street to Grand Boulevard
(Minor Arterial)
|
Resurfacing <20> |
$6,300,000 |
$6,300,000 |
| St. Louis |
Road Preservation and Pedestrian Improvements - Project "C" |
Project involves infrastructure improvements on
following arterials as shown on Project Map included in Appendix:
Hampton Avenue from Gravois Avenue to I-64(Principal Arterial)
Vandeventer Avenue from Kingshighway Blvd. to Natural Bridge Avenue
(Minor Arterial)
Washington Blvd. from Jefferson Avenue to Compton Avenue (Minor
Arterial)
|
Resurfacing <20> |
$7,140,000 |
$7,140,000 |
| St. Louis |
Traffic Signal Equipment Upgrades |
Project involves traffic signal equipment upgrades at approximately 160 intersections throughout St. Louis as shown
on Project Map included in Appendix. |
Misc Traffic Control Items / ITS <55> |
$4,700,000 |
$4,700,000 |
| St. Louis |
Wellington Avenue Bridge over River Des Peres Reconstruction |
Project begins on Wellinton Ave. at St. James Sq. and continues 813 feet with a bridge over River Des Peres terminating
just north of Burlington Norrn Santa Fe Railroad bridge. |
Replace Bridge(s) <33> |
$6,550,000 |
$6,550,000 |
| St. Louis |
Widening of Loughborough Bridge over Union Pacific Railroad |
This project involves construction along Loughborough Avenue at its intersection with Loughborough Drive and
Loughborough Commons entrance to intersection with Southbound I-55 On/Off
Ramps. |
Widening 3 to 5 Lanes <15> |
$831,032 |
$1,475,000 |
| St. Louis |
Central Business District Streetscape Improvements |
Limits of Streetscape Improvements include
following streets and related right-of-ways in downtown St. Louis:
- Tucker Blvd. from Washington Ave. south to Market Street
- 7th and 8th Streets from Washington Ave. south to Chestnut St.
-
Olive and Locust Streets from Tucker Blvd. east to Broadway |
Streetscape Improvements <02> |
$12,750,000 |
$12,750,000 |
| St. Louis |
Gateway Mall Hallway |
As shown on attached map, Gateway Mall Hallway project extends along right-of-way of Market Street from Broadway
on east to 22nd Street on west. |
Streetscape Improvements <02> |
$17,600,000 |
$17,600,000 |
| St. Peters |
Grand Teton Drive Extension II |
Grand Teton Drive, from approximately 500 feet north of Mexico Road to Suemandy Drive. |
Roadway Reconstruction <79> |
$1,225,000 |
$1,225,000 |
| St. Peters |
Jungermann Road Resurfacing III |
Jungermann Road, from Willott Road to McClay Road. |
Resurfacing 5 Lane Pvmt <24> |
$869,500 |
$869,500 |
| St. Peters |
Mid Rivers Mall Drive Resurfacing II |
Mid Rivers Mall Drive, from Mexico Road to St. Peters-Howell Road. |
Resurfacing 5 Lane Pvmt <24> |
$907,000 |
$907,000 |
| St. Peters |
Mid Rivers Mall Drive Traffic Signal Improvements |
Mid Rivers Mall Drive, from St. Peters-Cottleville Road to Cottleville Parkway. |
Traffic Signals <42> |
$321,900 |
$321,900 |
| St. Peters |
Ohmes Road Resurfacing |
Ohmes Road, from Birdie Hills Road to St. Peters-Cottleville Road |
Resurfacing 3 Lane Pvmt <22> |
$607,500 |
$607,500 |
| St. Peters |
Salt River Road - Spencer Road Intersection Realignment |
Spencer Road, from Elm Point Road to Highway 370 on ramp. |
Intersection Construction <48> |
$1,210,000 |
$1,210,000 |
| St. Peters |
Salt River Road Extension Bridges |
Proposed Salt River Extension Road crossings of Dardenee Creek and Spencer Creek. |
Construct Bridge(s) <34> |
$4,322,200 |
$4,322,200 |
| St. Peters |
Willott Road Bridge Replacement |
Willott Road crossing of Spencer Creek,
just west of Del Ray Court. |
Replace Bridge(s) <33> |
$1,297,000 |
$1,297,000 |
| St. Peters |
Willott Road Resurfacing |
Willott Road, from Mid Rivers Mall Drive to Kimberly Lane. |
Resurfacing 3 Lane Pvmt <22> |
$405,000 |
$405,000 |
| Sullivan |
E. Vine Street Improvement Project - Phase 2 |
E. Vine Street … McKinley Street to Hughes Ford
Road
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$766,676 |
$826,540 |
| Sunset Hills |
West Watson & Rott Road Improvements |
West Watson Road, from Highway 30 to Rott Road and Rott Road between West Watson Road and Robyn |
Replace Bridge(s) <33> |
$1,191,690 |
$1,191,690 |
| Sunset Hills |
West Watson Road Improvements |
West Watson Road, from Highway 30 to Rott Road and Rott Road between West Watson Road and I-270 |
Replace Bridge(s) <33> |
$0 |
$0 |
| Sunset Hills |
|
|
|
$0 |
$0 |
| Town & Country |
Clayton Road Pedestrian Enhancements |
Clayton Road from Mason Road to Woods Mill Road |
Pedestrian Facility <67> |
$230,000 |
$230,000 |
| Union |
Alternates for Church Street Improvement Project |
Church Street - Hwy 50 to Independence Drive
A project map will be submitted with supplemental information.
|
Pedestrian Facility <67> |
$207,932 |
$207,932 |
| Union |
Denmark Road Improvement Project |
Denmark Road - Progress Parkway to St. Andrews
Drive
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$1,140,665 |
$1,236,375 |
| Union |
Springfield Avenue Road Improvement Project |
Springfield Avenue - Independence Drive to Church
Street
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$378,860 |
$412,957 |
| University City |
Transportation Infraestructure Repair Project |
Several residential streets within limits of University City (map attached) |
Resurfacing <20> |
$1,900,000 |
$1,900,000 |
| Velda City |
Velda City Streets Makeover |
|
Paving <83> |
$771,825 |
$771,825 |
| Vinita Park |
Mid County Industrial Park Improvements on Page Ave. |
A map of project area will be submitted with or documentation on April 1, 2009. |
Left-turn Lanes <43> |
$1,256,658 |
$1,570,823 |
| Washington |
Camp Street Bridge |
bridge will span Busch Creek on
Camp Street, at approximate mid-point between East Rose Lane and Ninth
Street.
Find a project map enclosed. |
Construct Bridge(s) <34> |
$595,000 |
$595,000 |
| Washington |
Resurfacing of Various Streets |
West Eighth Street, from Hwy 47 west to Stafford
Street
West Main Street, from Tiemann Drive west to Westlink Drive
Grand Avevue, from Bernard Avenue south to Fifth Street
Pottery Road ( formerly Clay Street ), from Fifth Street south to
Hwy 100
Old Highway 100, from Fifth Street east to city limits
Find a project map enclosed. |
Resurfacing 2 Lane Pvmt <21> |
$935,000 |
$1,870,000 |
| Washington |
|
|
|
$0 |
$0 |
| Washington |
Mo Rte. 100 widening Phase III |
Section 1 beginning approx. 250' west of Mo. Rte.47
west to High St.
Section 2 High St. to Pottery Rd. (Clay St.) |
Widening 2 to 5 Lanes <14> |
$15,700,390 |
$15,700,390 |
| Webster Groves |
Bompart Avenue Resurfacing and Curb and Gutter Construction |
Bompart Avenue from Big Bend Blvd to Newport Avenue. |
Resurfacing 2 Lane Pvmt <21> |
$373,377 |
$373,377 |
| Webster Groves |
Concrete Streets Improvement Project |
City Limits |
Roadway Reconstruction <79> |
$13,089,700 |
$13,089,700 |
| Webster Groves |
E. Jackson Rd. Resurfacing and Curb and Gutter Construction |
E. Jackson Road from Edgar Road to Laclede Station Road |
Resurfacing 2 Lane Pvmt <21> |
$378,661 |
$378,661 |
| Webster Groves |
E. Kirkham Avenue Resurfacing |
E. Kirkham Avenue between N. Elm Avenue and Thornton Avenue |
Resurfacing 4 Lane Pvmt <23> |
$222,935 |
$222,935 |
| Webster Groves |
E. Lockwood Avenue Resurfacing |
E. Lockwood Avenue from Elm Avenue to Big Bend Boulevard |
Resurfacing <20> |
$430,537 |
$430,537 |
| Webster Groves |
Marshall Avenue Resurfacing |
Marshall Avenue from Bompart Avenue to Big Bend Boulevard |
Resurfacing 2 Lane Pvmt <21> |
$261,607 |
$261,607 |
| Webster Groves |
S. Rock Hill Road Resurfacing |
S. Rock Hill Road from W. Jackson Road to Big Bend Boulevard |
Resurfacing 2 Lane Pvmt <21> |
$137,645 |
$137,645 |
| Webster Groves |
W. Kirkham Avenue Resurfacing |
W. Kirkham Avenue from N. Rock Hill Road west to City Limits |
Resurfacing 2 Lane Pvmt <21> |
$111,725 |
$111,725 |
| Weldon Spring |
Independence Road and State Highway 94 Traffic Signal and Intersection
Reconstruction |
Intersection of Independence Road and Highway 94 (see attached map) |
Traffic Signals <42> |
$1,151,314 |
$1,186,314 |
| Weldon Spring |
Young Drive Extension and Widening |
Beckman Road to Siedentop Road (See attached map) |
New 2-Lane Roadway <72> |
$921,010 |
$966,010 |
| Wentzville |
David Hoekel Parkway |
Beginning at Goodfellow Rd and running north approximately 2.25 miles adjacent to existing subdivisions and
terminating at W. Meyer Rd. This project will also include reconstruction
of approximately 1500 l.f. of Goodfellow Rd. and approximately 2900 l.f. of
W. Meyer Rd to facilitate turn lanes and exit lanes from David Hoekel
Parkway. This will be phase 1 of a multi-phase project. |
New Roadways <70> |
$11,360,600 |
$11,360,600 |
| Wentzville |
Duello Rd Improvements-Callahan Rd to Prospect Rd |
project will begin at intersection of
Callahan Rd and Highway 40/61,
and extend souast to connect into proposed St. Charles County TIP project
for Duello Rd and Prospect Rd realignment. |
Roadway Reconstruction <79> |
$2,685,600 |
$2,685,600 |
| Wentzville |
Interstate Dr. Phase Three |
project will begin on west side of
intersection of Interstate Dr. and Wilmer Rd connecting Wilmer Rd to Hepperman Rd.
Interstate Dr. will be aligned and extended west .95 miles and terminate at
Hepperman Rd. This is phase three of a multi phase project. |
New Roadways <70> |
$3,830,030 |
$3,830,030 |
| Wentzville |
Mexico Rd Widening |
project will begin at newly reconstructed signaled intersection along MODOT State Route Highway A and extend north west
to a tapered transition area approximately 200 foot northwest of a privately
owned driveway designated High County Dr. |
Roadway Reconstruction <79> |
$4,300,694 |
$4,300,694 |
| Wentzville |
Wentzville Parkway-William Dierber Dr. to Schroeder Creek Blvd |
project will begin at intersection of
Wentzville Parkway and William
Deirberg Dr. extending north and east to intersection of Wentzville Parkway
and Schroeder Creek Blvd. It will include a signalized intersection at Great
Oaks Blvd. |
Bi-directional Left-turn Lane <53> |
$1,598,497 |
$1,598,497 |
| Wildwood |
Manchester Road Bike Lanes |
Both sides of Manchester Road, between Missouri Route 109 and Franklin County Line. |
Roadway Shoulders <89> |
$1,500,000 |
$1,500,000 |
| East-West Gateway Council of Governments |
Greater St. Louis Public Transportation Educational Program |
project will reach entire East-West Gateway service area, however some elements such as direct mail and community
out reach will be limited to areas Metro serves, St. Louis City, St. Louis
County and St. Clair County. |
Education/Marketing Program <01> |
$1,995,000 |
$1,995,000 |
| East-West Gateway Council of Governments |
Great Streets Demonstration Projects - Engineering Services |
maps showing limits of all four projects attached |
Traffic Calming/Access Mgt <03> |
$2,500,000 |
$2,500,000 |
| Festus Special Road District |
Scenic Drive, County Road, and Cherry Lane Resurfacing Project |
Scenic Drive - Herculaneum South City Limit to
Festus North City Limit
Cherry Lane - Hwy Z to County Road
County Road - Scenic Drive to Hwy Z
A project map will be submitted with supplemental information. |
Resurfacing <20> |
$718,710 |
$753,146 |
| Franklin County |
Bend Road Bridge Replacement |
Bend Road is a two-lane roadway with a one lane bridge crossing Meramec River south of Pacific. MoDOT currently
maintains roadway, titled Route N, through Pacific, where it is classified
as an Urban Collector. Franklin County takes ownership at approximately
first curve (at bluff line just east of Meramec River) for approximately 2.5
miles where it n switches back to MoDOT as Route N. A majority of Bend Road
within Franklin Countys jurisdiction lies within floodplain of
Meramec River. See attached Project Map. |
Replace Bridge(s) <33> |
$12,100,000 |
$12,100,000 |
| Franklin County |
New Hope Church Road Improvements, Bridges over Big and Little Indian
Creeks |
This project involves replacing a deficient and removed Bridge #3100014 over Big Indian Creek, replacing a 30' span low
water crossing at Little Indian Creek and approach road work to both creek
crossings all on New Hope Church Road about one mile east of Missouri Route K
and six (6) miles south of Missouri Route 30 and St. Clair, Missouri. |
Replace Bridge(s) <33> |
$1,095,700 |
$1,095,700 |
| Franklin County |
Old Highway 100 Bridge F-408 Replacement |
Old Highway 100 Bridge (MoDOT Bridge No. 4330001) over Busch Creek. Lat. 38° 32' 25.68" N; Long. 90° 58'
26.43" W Franklin County Missouri. |
Replace Bridge(s) <33> |
$1,365,000 |
$1,365,000 |
| Franklin County |
Overlay #1 |
Old Highway 100 begins at Washington City Limts and ends at Missouri Route AT. Old Highway 50 (East) begins at
Union City Limits and ends at U.S. Route 50. Old Highway 50 (West) begins at
U.S. Route 50 and ends at Missouri Route C. |
Paving <83> |
$2,082,264 |
$2,082,264 |
| Jefferson County |
Antire Road Pavement Preservation |
Antire Road from High Ridge Boulevard to St. Louis County Line in Sections 3, 10, 14 & 15, T43N, R4E, in Jefferson
County, Missouri. |
Resurfacing 2 Lane Pvmt <21> |
$262,000 |
$262,000 |
| Jefferson County |
Flucom Road Overlay |
Flucom Road from US Highway 67 to DeSoto City Limits in Sections 5,6,8 and 9 of T39N, R5E and Sections 1 and 2 of
T39N, R4E, Jefferson County, Missouri. |
Resurfacing 2 Lane Pvmt <21> |
$643,000 |
$643,000 |
| Jefferson County |
Guardrail on Main Street @ Gravois (Northwest) |
Main Street in House Springs between Gravois (Northwest) and Mo Route MM |
Miscellaneous <90> |
$91,910 |
$91,910 |
| Jefferson County |
Guardrail on Old Lemay Ferry Road |
Old Lemay Ferry Road south of MO Route M, between entrance/exit ramp to eastbound route M and Wedde Road. |
Miscellaneous <90> |
$125,160 |
$125,160 |
| Jefferson County |
Guardrail on Vogel Road (North of Old Lemay Ferry Road) |
On Vogel Road (in Arnold area) between Old Lemay Ferry Road and Vogel Circle |
Miscellaneous <90> |
$67,200 |
$67,200 |
| Jefferson County |
Klondike (South) Road Overlay |
Klondike (South) Road from Missouri Route E to McClain Street in Sections 10,15,16 and 21 of T39N, R4E, Jefferson
County, Missouri. |
Resurfacing 2 Lane Pvmt <21> |
$600,000 |
$600,000 |
| Jefferson County |
Konert Road Bridge Rehabilitation |
Konert Road Bridge # 0690001 over Romaine Creek In U.S. Survey 3011, T43N, R5E Jefferson County, Missouri. |
Rehabilitate Bridges(s) < 32> |
$894,000 |
$894,000 |
| Jefferson County |
Lions Den Road Reconstruction-Phase 3 |
Lions Den Road from Living Well Foundation Camp Road (formerly Lions Den Camp Road) to Binning Road in Section 34,
T43N, R5E, Jefferson County, Missouri. |
Roadway Improvements <80> |
$1,841,000 |
$3,445,131 |
| Jefferson County |
Little Brennan Road Reconstruction |
Little Brennan Road on south side of Highway 30 in NE 1/4 of Section 7, T43N, R5E, Jefferson County, Missouri. |
Widening 2 to 3 Lanes <12> |
$444,000 |
$444,000 |
| Jefferson County |
Montebello Road Pavement Preservation |
Is a part of US Surveys 2009, 2024, 2005, T42N, R6E,
Jefferson County, Missouri.
Project length 1.352 miles from US Highway 61-67 to Kimmswick City Limits. |
Resurfacing 2 Lane Pvmt <21> |
$88,565 |
$88,565 |
| Jefferson County |
Old Sugar Creek Road South Overlay |
Old Sugar Creek Road between Diehl Road and West Rock Creek Road in Sections 17, 20 and 29, T43N, R5E Jefferson
County Missouri. |
Resurfacing 2 Lane Pvmt <21> |
$794,000 |
$794,000 |
| Jefferson County |
River Street Road Overlay |
River Street (County Road No. 235)- 0.22 miles long running from State Highway K to State Highway 61-67. Section 17,
T42N, R6E, Jefferson County, Missouri. |
Resurfacing 2 Lane Pvmt <21> |
$119,500 |
$119,500 |
| Jefferson County |
West Four Ridge Overlay |
West Four Ridge (County Road # 038)- 5.06 miles long running from Old Highway 21 to West Rock Creek Road. |
Resurfacing 2 Lane Pvmt <21> |
$1,700,855 |
$1,700,855 |
| Franklin County, Union and Washington |
Mo. Rte. A (lane widening and shoulders) |
Mo. Rte. 47 (Union. Mo) to Chamber Dr. (Washington)
length approx. 7.5 miles
|
Widening <10> |
$3,096,910 |
$3,096,910 |
| Missouri Botanical Garden |
MBG Perimeter Improvements |
project is bordered by Shaw Blvd. on
North, Magnolia Ave. on South,
Tower Grove Ave. on East and Alfred Ave. on West. An additional corridor
also extends along Shaw Blvd. from Alfred Ave. to S. Vandeventer Ave. and
includes improvements along Vandevender Ave. from Shaw Blvd. to route 44. |
Streetscape Improvements <02> |
$2,170,000 |
$2,170,000 |
| St. Charles County |
ADA Compliant Ramp Reconstruction |
Attached is a spreadsheet showing 936 sidewalk ramps that require modifications or replacement in order to meet
current ADA standards. |
Pedestrian Facility <67> |
$850,000 |
$850,000 |
| St. Charles County |
Asphalt Overlay - 2010 |
Guthrie Road: Mexico Road to Highway P
Vomund Road: Highway 79 to Highway Y
Seeburger Road: New Town Boulevard to Highway B
W. Meyer Road: Highway W to North Point Prairie
|
Resurfacing 2 Lane Pvmt <21> |
$148,000 |
$580,000 |
| St. Charles County |
Asphalt Overlay #1 |
N. Point Prairie Road: I-70 North Outer Road to W.
Meyer Road
Peine Road: Highway 61 to Somerset Manor
Pitman Hill Road: Greens Bottom Road to Windcastle
Diehr Road: Highway DD to 0.2 miles west of Willow Park Drive
|
Resurfacing 2 Lane Pvmt <21> |
$520,000 |
$520,000 |
| St. Charles County |
Asphalt Overlay #2 |
Hackmann Road: St. Paul Road to Highway 79
Parr Road: Highway A to Highway P
|
Resurfacing 2 Lane Pvmt <21> |
$430,000 |
$430,000 |
| St. Charles County |
Asphalt Overlay #3 |
Pralle Lane: Jackson Place to Old South River
Road
Boschertown Road: Highway B to Fox Hill Road
|
Resurfacing 2 Lane Pvmt <21> |
$500,000 |
$500,000 |
| St. Charles County |
Bridge Deck Replacement |
Bridge 03200061 on Josephville Road over a Tributary
to Cuivre River
Bridge 0560002 on St. Paul Road over a Tributary to Peruque Creek
Bridge 35900161 on Femme Osage Creek Road over a Tributary to Femme Osage
Creek
Bridge 36100011 on Cappeln Osage Road over a Tributary to Femme
Osage Creek |
Bridge Deck Repair <31> |
$205,000 |
$235,000 |
| St. Charles County |
Diamond Grind |
Kisker Road: Highway 94 to Pitman Hill Road
Laura Hill Road: Highway K to Knaust Road
Jungs Station Road: Highway 94 to Amhurst Place |
Roadway Improvements <80> |
$800,000 |
$800,000 |
| St. Charles County |
Duello Road, Phase 1 Reconstruction |
From planned interchange at Highway 40/61 (I-64) west along Prospect Road to Duello Road n south to Bridge over
Peruque Creek. |
Roadway Reconstruction <79> |
$1,080,000 |
$3,761,000 |
| St. Charles County |
Duello Road, Phase 3 Reallignment |
From western90-degree turn north of Highway N, along a new alignment due south to Highway N. |
Roadway Realignment <71> |
$1,344,000 |
$3,045,000 |
| St. Charles County |
Duello Road, Phase 4 Intersection Realignment |
intersection of Duello Road and Highway N |
Intersection Improvement <40> |
$300,000 |
$510,000 |
| St. Charles County |
Ehlmann Road |
Zumbehl Road and Shady Oak Drive |
Roadway Reconstruction <79> |
$385,000 |
$2,593,000 |
| St. Charles County |
Femme Osage Creek Road Bridge Replacement |
Bridge over Tributary of Femme Osage Creek located approximately 0.8 miles east of Highway T. |
Replace Bridge(s) <33> |
$85,000 |
$491,000 |
| St. Charles County |
Greens Bottom Road, Phase 3 Reconstruction |
From Pitman Hill Road to Amrein Road |
Roadway Reconstruction <79> |
$500,000 |
$500,000 |
| St. Charles County |
Gutermuth Road, Phase 2 Reconstruction |
From Morhead Road to east of Tealwood Drive |
Roadway Realignment <71> |
$840,000 |
$2,900,000 |
| St. Charles County |
Guthrie Road Bridge Replacement |
Bridge over unnamed tributary to Peruque Creek located approximately 0.5 miles north of Mexico Road. |
Replace Bridge(s) <33> |
$125,000 |
$685,000 |
| St. Charles County |
I-70 Reliever Route, Phase 1 Reconstruction |
From Dardenne Creek along Highway C n along Salt River Road to Brown Road |
Roadway Reconstruction <79> |
$471,000 |
$3,300,000 |
| St. Charles County |
I-70 Reliever Route, Phase 2 Reconstruction |
From Arrowhead Industrial Boulevard to Brown Road |
Roadway Reconstruction <79> |
$852,000 |
$2,730,000 |
| St. Charles County |
Interstate Drive |
From Highway Z along a new alignment to Quail Ridge Parkway |
New 2-Lane Roadway <72> |
$3,000,000 |
$3,860,000 |
| St. Charles County |
McClay Road Reconstruction |
From Thoele Road to St. Peters-Howell Road |
Roadway Reconstruction <79> |
$1,240,000 |
$3,870,000 |
| St. Charles County |
Pitman Road and Highway A Connection |
Connecting Highway A to Pitman Road with loop road. |
Intersection Construction <48> |
$750,000 |
$1,000,000 |
| St. Charles County |
Seal Coat |
Dingledine Road: Towers Road to Southgate
Caulks Hill Road: Harvester Road to Towers Road
St. Paul Road: Highway Y to Highway P
Patriotic Trail: Wolfrum Road to Independence Road
N. Point Prairie Road: W. Meyer Road to Highway
61 |
Resurfacing 2 Lane Pvmt <21> |
$600,000 |
$600,000 |
| St. Charles County |
Thoele Road Reconstruction |
From McClay Road to Spring Wood Drive |
Roadway Reconstruction <79> |
$800,000 |
$2,485,000 |
| St. Charles County |
Wolfrum Culvert Replacement |
On Wolfrum Road 0.23 miles east of Patriotic Trail over an unnamed tributary to Missouri River. |
Culvert <57> |
$300,000 |
$300,000 |
| St. Louis County |
Old State Road "B" |
300' south of Pierside Lane to Old State Spur
This project will create 45 jobs during construction. |
Widening 3 to 5 Lanes <15> |
$8,800,000 |
$8,800,000 |
| St. Louis County |
Barrett Station Road |
Dougherty Ferry Road to Manchester Road (MO Route
100). It includes westbound Dougherty Ferry Road to northbound Barrett
Station Road right turn lane.
This project includes additional mill and overlay projects. Thirtyfive jobs
will be created at Barrett Station Road. Each additional location will
create between 20 and 35 jobs. Approximately 10 - 12 jobs will be created at
materials processing facilities. |
Roadway-Curb & Gutter <86> |
$5,100,000 |
$5,100,000 |
| St. Louis County |
Baxter Road Improvement Project - Completing Baxter Road Corridor |
Parkway West Middle School to Hearcroft Drive |
Widening 2 to 3 Lanes <12> |
$7,500,000 |
$7,500,000 |
| St. Louis County |
Core Arterial Road Rehabilitation with Green Construction Materials |
See Exhibit A and Exhibit B. Project maps are included in back-up materials and show locations of infrastructure
improvements sites: Airport Road - James S. McDonnell Blvd to I-170, James
S. McDonnell Boulevard - Natural Bridge Rd to Air Cargo Rd and Berkely Rd to
Lindbergh Blvd, Warson Road/Ashby Road - Olive Blvd to Page Ave, Sappington
Road - Big Bend Rd to Gravois Rd, Midland Boulevard - Delmar Blvd to 100 feet
south of Canton, Mason Road - Manchester Rd to Conway Rd, and Mattis Road -
Worthington Dr to Little Rock Rd. This project will create up to 257 jobs. |
Resurfacing 5 Lane Pvmt <24> |
$7,575,570 |
$7,575,570 |
| St. Louis County |
Intelligent Transportation System - County Wide |
This project will improve our Intelligent Transportation System (ITS) system countywide. Exhibit B has a list of
specific sites. |
Misc Traffic Control Items / ITS <55> |
$16,500,000 |
$16,500,000 |
| St. Louis County |
Route 141 Missing Link - Finish 141: Page to Olive Connector |
Page to Olive Connector is one of last pieces to be completed in central part of Highway 141 to Earth City Expressway
corridor. Page to Olive Connector begins at intersection of proposed
Relocated Route 141 and Olive Boulevard. project extends north to recently
opened extension of Maryland Heights Expressway (MHE)at Waterworks Road.
From that point north, Page to Olive Connector includes addition of lanes
to existing two lane section of MHE. This continues until it joins
four-lane section of MHE at River Valley Drive. |
New 4-Lane Expressway <78> |
$75,000,000 |
$75,000,000 |
| St. Louis County |
Scudder Road Access Improvements |
Hanley Road to I-170 |
Intersection Improvement <40> |
$0 |
$0 |
| St. Louis County |
South County Connector at Hanley and Manchester |
project includes reconstruction of
intersection of Hanley Road, a County operated arterial and Missouri Route 100, a State
operated arterial. project limits extend from intersection of Hanley Road
and Litszinger Road, north of Manchester Road to intersection of Hanley Road
and Flora Avenue, south of Manchester Road. This project will result in
creation of 2170 jobs. Additional jobs will be created as proposed
development projects are implemented. |
Intersection Reconstruction <49> |
$33,305,500 |
$50,305,500 |
| St. Louis County |
Union Road Extension |
Linbergh Blvd. to Lemay Ferry Road, opposite I255 off-ramp. |
New Roadways <70> |
$0 |
$0 |
| Bellefontaine Neighbors |
Overlay of Belgrove Drive, St. Cyr & Coburb Lands Drive |
Belgrove Drive - Bellfontaine Road to Lilac
Road
St. Cyr - West City Limits to East City Limits
Coburb Lands Drive - Bellfonatine Road to Chambers Road |
Resurfacing 2 Lane Pvmt <21> |
$1,109,190 |
$1,109,190 |
| Bellefontaine Neighbors |
St. Cyr Bridge Replacement |
project limits will extend approximately 100 feet each side of bridge to reconstruct approach pavement. |
Replace Bridge(s) <33> |
$920,568 |
$920,568 |
| Bellefontaine Neighbors |
Reconstruction of Shepley Drive |
|
|
$0 |
$0 |
| Bellefontaine Neighbors |
Reconstruction of Shepley Road |
Bellefontaine Road east to Lilac. |
Roadway Reconstruction <79> |
$1,954,103 |
$1,954,103 |
| Berkeley |
Airport Road and Bridge Improvements |
project limits extend east along Airport Road, beginning east of James S McDonnell Blvd. and ending east of Interstate
170. This project includes bridge complex at interchange of Interstate 170
over Airport Road and exit ramps from Interstate 170. (Refer to Exhibit -1) |
Resurfacing 5 Lane Pvmt <24> |
$3,211,900 |
$3,211,900 |
| Berkeley |
Street Improvements of Evergreen, January and Alder |
Evergreen: January South to City Limits
January: Alder to East of City Limits
Alder: Frost Avenue to Evergreen |
Resurfacing 2 Lane Pvmt <21> |
$1,098,156 |
$1,098,156 |
| Ferguson |
Church Street Improvements |
Elizabeth Ave. to Florissant rd |
Paving <83> |
$526,563 |
$526,563 |
| Ferguson |
Forestwood Avenue Reconstruction |
From intersection of Ferguson Avenue and Forestwood Avenue north to Chambers Road (approx. 4,700 ft.) |
Roadway Reconstruction <79> |
$2,987,059 |
$2,987,059 |
| Frontenac |
Spoede Conway Improvements |
project limits are from
intersection of Spoede Road and Clayton Road approximately 1 mile North to
City Limits and from intersection of Conway Road and S. Lindbergh Blvd.
approximately 1 mile West to City Limits.
Please see attached project
map. |
Pedestrian Facility <67> |
$2,327,157 |
$2,327,157 |
| Northwoods |
Lillian Avenue Improvements |
Highway 70 South Outer Road from City Limits to City Limits. |
Resurfacing <20> |
$741,816 |
$741,816 |
| Shrewsbury |
Street Improvements (Overlay / Slab Replacement) of Weil,
Kennrick,Trianon and Parkway |
Weil ave.- From Shrewsbury ave to east city
limits
Kenridge/Trianon Parkway- From LaClede Station to Watson |
Resurfacing <20> |
$737,093 |
$737,093 |
| Valley Park |
St. Louis Avenue Improvements |
|
|
$0 |
$0 |
| Vinita Park |
Industrial Park Street Improvements |
Crystal Industrial, Delport, Mid County, Chapen Industrial and Bodine. |
Resurfacing 2 Lane Pvmt <21> |
$837,743 |
$837,743 |
| University of Missouri - St. Louis |
Natural Bridge Great Streets Project (Phase 2 Construction) |
|
Streetscape Improvements <02> |
$7,647,733 |
$7,647,733 |
| Washington Special Road District |
WSRD - Bethlehem Church Road Resurfacing |
Resurfacing Bethlehem Road from Bieker Road to N. Goodes Mill Road. Resurfacing project will consist of approximately
1.2 miles. Project is within Franklin County and is south of Washington, MO.
See site map. |
Resurfacing 2 Lane Pvmt <21> |
$132,796 |
$165,995 |
| Washington Special Road District |
WSRD - Bieker Road Resurfacing |
Resurface approximately 4.0 miles of Bieker Road from Washington City limits to Bethlehem Church Road. This project
is within Franklin County. A portion of Bieker Road route to be resurfaced
has a speed limit of 35 MPH and a portion has a speed limit of 40 MPH. See
attached site map. |
Resurfacing 2 Lane Pvmt <21> |
$437,953 |
$547,441 |
| Washington Special Road District |
WSRD - Bieker Road Widening |
Widen and incorporate or safety improvements along approximately 1.5 miles of Bieker Road. Project will start at
Bethlehem Church Road and continue north to that portion of Bieker Road that
was previously widened in 2008. Project is within Franklin County. See
attached project location map. |
Widening <10> |
$174,394 |
$217,993 |
| Washington Special Road District |
WSRD - Mealer Lane Resurfacing |
Resurface project will consist of approximately 1.5 miles. Project is within Franklin County and is west of Washington,
MO. See site map. |
Resurfacing 2 Lane Pvmt <21> |
$139,368 |
$174,210 |
| Washington Special Road District |
WSRD - North Goodes Mill Road Resurfacing and Safety Improvements |
Resurface N. Goodes Mill Road from South Point Road to Bethlehem Church Road, in Franklin County. Project will also
include reconstruction of road over an unnamed tributary to DuBois Creek.
Total project length is approximately 2.0 miles. See location map. |
Resurfacing 2 Lane Pvmt <21> |
$270,991 |
$338,739 |
| Bi-State Development Agency (d.b.a. Metro) |
Phase I MetroLink Infrastructure Rehabilitation - Bridges and
Tunnels |
St. Louis, MO
St. Louis County, MO
St. Clair County, IL |
Metro Link Improvements <87> |
$19,000,000 |
$19,000,000 |
| Columbia |
Quarry Road/ Old IL-3 Intersection Improvements |
proposed work is on north leg (Old IL-3), south leg (Ghent
Road), and west leg (Quarry Road) of intersection
of Quarry Road and Old IL-3/ Ghent Road. |
$397,000 |
$397,000 |
| Highland |
US Route 40 / Hemlock Street Intersection Improvements |
From approximately 1500' west of Hemlock Street to
approximately 1200' east of Hemlock Street on US
Route 40. |
$470,000 |
$515,000 |
| O'Fallon |
Seven Hills Road @ State Street/Vincennes Road - Roundabout Intersection
Improvement |
Intersection of Seven Hills Road ((FAU 9172) and State
Street/Vincennes Road (FAU 9164) in O'Fallon, Illinois
(St. Clair County). See attached location map. |
$750,000 |
$750,000 |
| Madison County Mass Transit District |
Direct Mid-Day Regional Connector |
N/A |
|
$1,290,000 |
$1,290,000 |
| Madison County Mass Transit District |
Eastport Park and Ride Service |
N/A |
|
$750,000 |
$750,000 |
| Madison County Mass Transit District |
IL 157/159 Express Corridor Replacement Buses |
N/A |
|
$1,500,000 |
$1,500,000 |
| Madison County Mass Transit District |
IL 157/159 Express Corridor Service Expansion |
N/A |
|
$1,875,000 |
$1,875,000 |
| Madison County Mass Transit District |
IL 3 Express Corridor Replacement Buses |
N/A |
|
$750,000 |
$750,000 |
| Madison County Mass Transit District |
IL 3 Express Corridor Service Expansion |
N/A |
|
$2,250,000 |
$2,250,000 |
| Madison County Mass Transit District |
MCT Bike Share Program |
N/A |
|
$525,000 |
$525,000 |
| Madison County Mass Transit District |
St. Louis County Mobility Initiative |
|
|
$1,103,375 |
$1,103,375 |
| Madison County Mass Transit District |
Transit Parking and Pedestrian Crossing Facilities, Edwardsville IL |
|
|
$2,800,000 |
$4,800,000 |
| Madison County Mass Transit District |
US 40 Express Corridor Replacement Buses |
N/A |
|
$1,500,000 |
$1,500,000 |
| Madison County Mass Transit District |
US 40 Express Corridor Service Expansion |
N/A |
|
$750,000 |
$750,000 |
| Metro East Park and Recreation District |
Confluence Bikeway Central Trail - McKinley Bridge to Malcolm W. Martin
Memorial Park |
project starts approximately 1000
feet north of McKinley Bridge at termination of McKinley Bridge Bikeway and Confluence Bikeway North
Trail, traverses south parallel and on top of Mississippi River Levee until
it reaches Front Street in East St. Louis, Illinois. From this point it runs
south on Front Street under Martin Lur King and Eads Bridge to its
termination at Malcolm W. Martin Memorial Park in East St. Louis, Illinois. |
$1,128,600 |
$1,128,600 |
| Metro East Park and Recreation District |
MEPRD - Troy Scott - Southwestern Illinois College (SWIC) Bikeway |
project starts at Interstate
55/70 near Wilson Heights Road on abandoned Illinois Terminal railroad right-of-way. project follows Illinois
Terminal abandoned railroad right-of-way to State Street in O'Fallon,
Illinois. From this location project heads souast and north of Shiloh,
crossing Illinois Route 158 to Shiloh Metrolink Station. bikeway n heads
south and n west crossing under Illinois Route 158 and n runs southwesterly
crossing Illinois Route 161 and terminating at Southwestern Illinois College
Belleville Campus. |
$12,000,000 |
$12,000,000 |
| St. Clair County Transit District |
St. Clair County Community OUtreach Program |
St. Clair County, IL |
|
$300,000 |
$300,000 |
| Sauget |
Curtiss Steinberg Intersection Improvement |
From intersection of Curtis Steinberg Road and Sauget
Industrial Parkway, along Curtis Steinberg Road 500
feet west, along Sauget Industrial Drive 500 feet North, along Mark Allen
Drive 500 feet east, along Vector Drive 300 feet south. |
$1,194,700 |
$1,194,700 |
| Metro |
New and Expanded MetroBus Service |
St. Louis, MO
St. Louis County, MO |
|
$27,807,081 |
$27,807,081 |
| Arnold |
Intersection of Missouri State Road and Astra Way: Intersection Control
Upgrade |
See Attachment 1, final sent to Jason Lange by email 2/13/09
from Shawn White (CBB) |
$1,013,000 |
$1,254,900 |
| Berkeley |
Berkeley Bus Station and Pedestrian Bike Way |
Airport Road to Maline Creek. |
|
$874,924 |
$874,924 |
| Brentwood |
Rose Avenue Pedestrian Improvements Project |
Rose Avenue from Brentwood Boulevard to Brentwood Promenade
Court (see Appendix A). |
$150,000 |
$150,000 |
| Cottleville |
Brittany Cove Drive/HwyN - Traffic Signal |
project is an installation of a
new traffic signal along Hwy N at intersection of Brittany Cove Drive/Hwy N/Country Ridge Drive. Cottleville
has taken responsibility of Hwy N at this location; refore, MoDOT approval is
not needed for this project. Please see Appendix A for location map. |
$180,000 |
$180,000 |
| O'Fallon |
Route M (Main Street) Traffic Signal Upgrades and Interconnect |
Route M (Main Street) is a north/south street that starts at
I-70. This project will upgrade signals and provide
an interconnection from West/East Terra to MO State Highway P; a total
distance of 1.80 miles. Intersections as part of this application are as
follows: West Terra, Pitman, Church, Elm, Third, St. Joseph, Tom Ginnever,
and Highway P. |
$839,000 |
$839,000 |
| Olivette |
Old Bonhomme Boulevard Street Improvements |
See Attached Map |
|
$1,165,000 |
$1,165,000 |
| Olivette |
Old Bonhomme Road Reconstruction |
See Attached Map |
|
$15,850,000 |
$15,850,000 |
| Rock Hill |
Intersection Improvements at Rock Hill Road and Brownbert Lane, Steger
School and Lithia Avenue |
project is located on Rock Hill
Road and will address intersections of Brownbert Lane, Steger School
(entrance) and Lithia Avenue which are located in close proximity to one
anor.
See Exhibit 1: Proposed Improvements
See Exhibit 2: Project
Location Map |
|
$313,000 |
$313,000 |
| St. Charles |
Elm Street Widening |
Elm Street from Highway 370 south to Elm Point Industrial Drive |
$1,200,000 |
$1,200,000 |
| St. Charles |
Fifth Street Corridor Phase II |
This project is located on Fifth Street between First Capitol
Drive and Tompkins Street. |
$520,000 |
$520,000 |
| St. Charles |
I-70 and 5th Street |
Fifth Street from I-70 overpass to just north of intersection
with Ameristar Blvd. and approximately 550 feet of
ramp from westbound I-70 to northbound Fifth Street. |
$1,100,000 |
$1,400,000 |
| St. Charles |
|
|
|
$0 |
$0 |
| St. Louis |
Delmar Boulevard - Signal Interconnection and Upgrades |
Delmar Boulevard from Vandeventer Avenue to City Limits (west
of Skinker Boulevard). This project addresses 18
signalized intersections including interconnection, signal hardware upgrades,
and pedestrian accessibility improvements along Delmar Boulevard corridor.
See Attachment A for Project Location Map. |
$3,475,000 |
$3,475,000 |
| St. Louis |
Goodfellow Boulevard - Signal Interconnection and Upgrades |
Goodfellow Boulevard from Lilian Avenue to Delmar Boulevard.
This project addresses 18 signalized intersections
including interconnection, signal hardware upgrades, and pedestrian
accessibility improvements along Goodfellow Boulevard corridor. See
Attachment A for Project Location Map. |
$3,950,000 |
$3,950,000 |
| St. Louis |
Morgan Ford Road - Signal Interconnection and Upgrades |
Morgan Ford Road from Arsenal Street to City Limits (south of
River Des Peres Boulevard). This project addresses
11 signalized intersections including interconnection, signal hardware
upgrades, and pedestrian accessibility improvements along Morgan Ford Road
corridor. See Attachment A for Project Location Map. |
$2,450,000 |
$2,450,000 |
| Wildwood |
Route 100 Pedestrian/Bicycle Bridge at Earton Road |
Route 100 at Earton Road |
|
$900,000 |
$900,000 |
| Forest Park Forever |
Forest Park Wayfinding Signage |
See Exhibit 1 |
|
$0 |
$0 |
| Missouri Department of Transportation |
Franklin County Signals and ITS |
Route 100: Rt M to Southpointe
Route 50: I-44 to Rt 47 East
Routes 100 & 47: Washington area
Routes 50& 47: Union area
I-44 Bussiness Loop: Pacific area |
|
$3,003,756 |
$3,003,756 |
| Missouri Department of Transportation |
Intersection Improvements at US 67 and I-270 |
Southbound US 67 ramp to I-270 from Candle Light Lane to I-270
and US 67 ramp split. |
$363,000 |
$363,000 |
| Missouri Department of Transportation |
MO 100 Signals and ITS |
MO 100 from McKnight to MO 109 |
|
$2,056,984 |
$2,056,984 |
| Missouri Department of Transportation |
MO 30 Signal Upgrade and ITS |
MO 30 from Routes B & NN to River Des Peres |
|
$1,929,551 |
$1,929,551 |
| Missouri Department of Transportation |
Signal System Optimization |
Several signal corridors in St. Louis County area. |
|
$361,200 |
$361,200 |
| Missouri Department of Transportation |
US61-67 Signal System and ITS |
US61-67 from MO 267 (Lemay Ferry) to MO 110 |
|
$3,796,551 |
$3,796,551 |
| Missouri Department of Transportation |
Westbound I-70 Auxiliary Lane - Eastern Section |
Westbound I-70 auxiliary lane from TR Hughes Blvd off-ramp to
TR Hughes Blvd on-ramp |
$800,000 |
$800,000 |
| Missouri Department of Transportation |
Westbound I-70 Auxiliary Lane - Western Section |
Westbound I-70 auxiliary lane from 1700-feet west of TR Hughes
Blvd to 925-feet east of Route K bridge |
$1,276,000 |
$1,276,000 |
| St. Charles County |
Coordinated Traffic Signal Closed Loop System Improvements |
Six locations within Saint Charles County. Please see attached
map with ir locations indicated on it. |
$280,000 |
$280,000 |
| St. Charles County |
Incandescent bulb conversion to Light Emitting Diode (LED) for Traffic
Signals & Street Lights |
Fourteen locations within Saint Charles County. Please see
attached map with ir locations indicated on it. |
$95,000 |
$95,000 |
| St. Charles County |
St. Peters-Howell and McClay Traffic Signal |
Intersection of St. Peters-Howell Road and McClay Road.
interconnect air waves between this intersection
and proposed traffic signal installation at Central Elementary School
entrance across from Toelle Road will be utilized to create a closed loop
coordinated system. |
$31,200 |
$171,000 |
| St. Charles County |
St. Peters-Howell and Toelle Traffic Signal |
Intersection of St. Peters-Howell Road, Central Elementary
School entrance and Toelle Road. nearby intersection
of St. Peters-Howell and Central School Road would also be improved by this
project. Its controller assembly will receive a new controller for
compatibility with this closed loop coordinated system, a wireless radio for
interconnect communications and licensed copy of manufacturer's closed loop
system software to be used by St. Peters. No antennas will be required at
se two controller cabinets due to ir proximity and line of site. |
$40,600 |
$218,000 |
| St. Louis County |
Intelligent Transportation System - Countywide |
See
Exhibit A - Map
Exhibit B - List of sites
Exhibit C - Functional Classification of site roads |
|
$16,500,000 |
$16,500,000 |
]
|
|
|
|