St. Louis Urbanized Area - - Submitted Projects and Programs

[American Recovery and Reinvestment Act of 2009

St. Louis Urbanized Area - - Submitted Projects and Programs

GRAND TOTAL CMAQ Program
STATE Stimulus $ Total $ # Total $ # Stimulus $ Total $ #
Illinois $241,955,176 $258,594,246 86 $225,215,571 68 $31,333,675 $33,378,675 18
Missouri $785,711,851 $870,416,147 256 $777,236,200 225 $92,320,847 $93,179,947 31
Multi-State $19,000,000 $19,000,000 1 $19,000,000 1 $0 $0 $0
TOTAL $1,046,667,027 $1,148,010,393 343 $1,021,451,771 294 $123,654,522 $126,558,622 49
Projects have not been reviewed for eligiblity , duplication, or correctness.
Source: East-West Gateway Council of Governments


Sponsor Project Title Location Improvement Stimulus share Total cost
Metro Illinois Preventive Maintenance - Slope Stability, Erosion, and Retaining Wall Repairs St. Clair County, IL

Project map is attached.
Transit Capital Imps. <08> $3,500,000 $3,500,000
Alton Fosterburg Road - Phase 3 (FAU Route 9002) From 450 feet north of Culp Lane norrly 2,796 feet or 0.53 miles to a point 840 feet south of Illinois Route 255. Bi-directional Left-turn Lane <53> $1,100,000 $1,453,000
Alton Fosterburg Road - Culvert Repair (FAU Route 9002) This project is located on Fosterburg Road north of Illinois Route 255/ Fosterburg Road Interchange and 560 feet north of Stutz Lane. Culvert <57> $185,000 $185,000
Alton Fosterburg Road - Resurfacing (FAU Route 9002) From 100 feet north of Stutz Lane extending north to Drexelius Road a distance of 1,210 feet or 0.23 miles. Resurfacing 2 Lane Pvmt <21> $184,000 $197,000
Belleville Royal Heights Road Resurfacing Royal Heights Road (FAU 9260) extends norrly from North Belt West (FAU 9257) about 0.60 miles to IL 161 (FAP 805). Resurfacing <20> $450,000 $450,000
Belleville West Washington Street/Centerville Avenue Resurfacing West Washington Street (FAU 9270) from IL 159 (FAP 600) westerly about 0.32 miles to Centerville Avenue (FAU 9269) and Centerville Avenue from West Washington Street southwesterly about 0.20 miles to CN Railroad (formerly ICRR). Resurfacing 2 Lane Pvmt <21> $850,000 $850,000
Belleville Frank Scott Parkway West Frank Scott Parkway West (FAU 9256) from Belleville West Parkway (formerly South 17th St.) sourly about 1.59 miles to just south of Concordia Church Road. Bi-directional Left-turn Lane <53> $800,000 $1,900,000
Centreville Church Road Improvements Church Road from IL Route 157 to Mousette Lane Resurfacing <20> $977,530 $977,530
Collinsville Bridge Replacement on South Clinton Street (FAU 9134) over Canteen Creek Bridge replacement with approach pavement from about 25' north of existing bridge location to about 25' south of existing bridge location. Bridge Removal <38> $2,633,000 $2,633,000
Collinsville Bridge Replacement on Summit Avenue (FAU 9133) over Brush Creek Bridge replacement with approach pavement from Johnson Hill intersection (approx. 50' north) to about 50' south of existing bridge location. Bridge Removal <38> $818,000 $818,000
Collinsville Ostle Drive Resurfacing Project project will cover improvements to Ostle Drive from appoximately 50' east of Newport Drive to Waverly Drive. Resurfacing 2 Lane Pvmt <21> $165,000 $165,000
Collinsville South Clinton Street Improvement - Phase 2 entire project will cover improvements to South Clinton Street from Cemetery Street to Illinois Route 159 (FAP 600) (a.k.a. Morrison Avenue). Phase 2 improvements will be from Lasalle Street to Illinois Route 159. Roadway Reconstruction <79> $1,270,000 $1,270,000
Collinsville Spring Street Spring Street (FAU 9124) from Lebanon Road (FAU 9127) to Illinois Route 159 (FAP 600), 3,140 feet (0.6 mile). Roadway Reconstruction <79> $1,000,000 $2,725,000
Columbia Palmer/Quarry Road Resurfacing Palmer Road (FAU 9300)/Quarry Road (FAU 9296) from just east of DD Road to Ghent Road (FAU 9310)/Old IL Route 3 (FAU 9296), approximately 2,400-ft. Paving <83> $440,000 $440,000
East St. Louis 17th Street Resurfacing 17th Street from Russell Avenue to Broadway Resurfacing 2 Lane Pvmt <21> $567,090 $567,090
Edwardsville Goshen Road Improvements - Phase 3 Phase 3 of Goshen Road Improvements will run from end of Phase 2 improvements (about 100 feet east of District Drive) to 1150' east of District Drive. Roadway Reconstruction <79> $520,000 $520,000
Edwardsville Madison Avenue Resurfacing norrn terminus of this project is Jefferson Road, and sourn terminus of this project is Hadley Avenue. project length is 2,600 feet. Resurfacing 2 Lane Pvmt <21> $349,000 $349,000
Edwardsville Schwarz Street Reconstruction western terminus is about 200' west of Fillmore Street, and eastern terminus is about 200' east of Springer Avenue. project legth is approximately 1,500 feet. Resurfacing 2 Lane Pvmt <21> $498,000 $498,000
Fairview Heights Union Hill Road Resurfacing From Lincoln Trail to Longacre Drive Resurfacing 2 Lane Pvmt <21> $384,000 $384,000
Granite City Maryville Road (FAU 9080) - Phase 1 project begins at intersection of Illinois Route 203 and continues south to intersection of Pontoon Road for a total distance of 6,206 feet. Resurfacing <20> $1,352,800 $1,352,800
Granite City Maryville Road (FAU 9080) - Phase 2 project begins on south at intersection of Pontoon Road and continues south to intersection of St. Clair Avenue for a total distance of 4,628 feet. Resurfacing <20> $1,148,200 $1,148,200
Granite City Maryville Road (FAU 9080) - Phase 3 project begins on south at intersection of St. Clair Avenue and continues south to intersection of Terminal Avenue for a total distance of 2,232 feet. Resurfacing <20> $643,200 $643,200
Granite City Maryville Road (FAU 9080) - Phase 4 project begins at intersection of Terminal Avenue and continues south to intersection of Illinois Route 162 for a total distance of 3,951 feet. Resurfacing <20> $983,300 $983,300
Granite City Mockingbird Lane (FAU Route 9024) project begins at intersection of Stratford Lane and continues south to Alton-Sourn Railroad tracks. This project will also include a storm sewer outfall along Whippoorwill Lane. project limits for Whippoorwill Lane are from intersection with Mockingbird Lane east to Country Place Lane. Roadway Reconstruction <79> $900,000 $900,000
Granite City St. Clair Avenue project begins at intersection of St. Clair Avenue and Maryville Road and will continue east approximately 2,323 feet to intersection with Mockingbird Lane. New Roadways <70> $1,691,900 $1,691,900
Highland Iberg Road Reconstruction Reconstruct Iberg Road from Broadway (St. Rose Road) to Plocher Way. Roadway Reconstruction <79> $500,000 $1,620,000
Highland Koepfli Road Reconstruction Phase 3 Reconstruct Koepfli Lane (FAU8841) from Illinois Route 143 (FAP 789) to Pine View Drive. Roadway Reconstruction <79> $500,000 $1,220,000
Highland Lindenthal Avenue Resurfacing Lindenthal Avenue (FAU 8853) from Washington Street (FAU 8850) to Poplar Street (FAU 8845). Resurfacing 2 Lane Pvmt <21> $100,000 $201,250
Lebanon Monroe Street Sidewalks St. Louis Street to Horner Park Pedestrian Facility <67> $418,000 $418,000
Lebanon St. Louis Street Improvements - Phase 2 Horner Street to Monroe Street Roadway Improvements <80> $615,000 $615,000
Madison Bissell Street (FAU 9104) Phase 1 proposed improvement begins on east of railroad tracks and continues easterly to intersection of Klein Avenue. Roadway Reconstruction <79> $868,500 $868,500
Madison Ohio Avenue Pedestrian Walkway project begins at Old Madison Road and continues westerly to Illinois Route 203. Pedestrian Facility <67> $392,000 $392,000
O'Fallon, Ill Milburn School Road, Phase 4 From Old Collinsville Road to Quarter Section Line (2,600 L.F. east of Old Collinsville Road) Roadway Reconstruction <79> $1,160,500 $1,160,500
O'Fallon, Ill Old Collinsville Road Improvements Frontage Road/Salem Place to Milburn School Road Roadway Reconstruction <79> $1,114,000 $2,921,000
Troy Troy - Country Village Estates Frontage Road Overlay Project Country Village Estates Frontage Road Overlay project originates at Illinois Route 162 and continues south along west frontage road of Interstate 55/70 approximately 0.6 miles to its terminus near City limits of Troy, Illinois. Resurfacing 2 Lane Pvmt <21> $134,750 $134,750
Venice Broadway Avenue (FAU 9097) Rehabilitation proposed improvement begins at intersection with Klein Avenue and continues norasterly to intersection of McKinley Avenue. Resurfacing 4 Lane Pvmt <23> $625,500 $625,500
Waterloo Lakeview Drive/Park Street Right Turn Lane Proposed right turn lane on Lakeview Drive at Park Street (Illinois 156) intersection. Work also includes widening of Lakeview pavement for right turns from Park Street. Right-turn Lanes <54> $297,000 $330,000
Wood River Edwardsville Road From Grand Ave. souasterly to 9th Street, a total distance of 1.27 miles. Resurfacing 3 Lane Pvmt <22> $3,024,000 $3,252,000
Wood River N. Old St. Louis Road (FAU Route 9005) Phase 1 From Old GM&O Crossing Norrly to Grand Ave., a total distance of 0.70 miles. Resurfacing 2 Lane Pvmt <21> $354,000 $384,000
Wood River N. Old St. Louis Road (FAU Route 9005) Phase 2 From Madison Ave. (IL Route 143, FAP 789) Norrly to Old GM&O Crossing, a total distance 0.38 miles. Roadway Reconstruction <79> $1,047,000 $1,203,000
Wood River South 6th Street From Rohm Pl. norrly to Madison Ave. (IL Route 143, FAP 789), a total distance 0.5 miles. Resurfacing 2 Lane Pvmt <21> $255,300 $277,300
Metro East Park and Recreation District MEPRD - Malcolm W. Martin Park Multipurpose Visitor Facility project entails construction of a Multipurpose Visitor Facility at Malcolm W. Martin Park in East St. Louis, Illinois. facility will be located at end of Confluence Bikeway Central Trail, and origination of Confluence Bikeway South Trail. This places facility approximately 1000 feet south of Metrolink East Riverfront Station. Miscellaneous <90> $3,700,000 $3,700,000
Southern Illinois University Edwardsville University Park Drive & North Research Drive University Park Drive extends easterly from Research Drive to IL 157.
North Research Drive begins 820' north of University Park Drive and extends norrly to P3 Drive.
Resurfacing <20> $440,000 $840,000
Southwestern Illinois Development Authority Port of East St. Louis project will be situated on Mississippi Riverfront along sourn tip of East St. Louis and norrn tip of Sauget, Illinois, running from just north of MacArthur Bridge to Cahokia Marine Service terminal, comprising approximately 300 acres. Miscellaneous <90> $133,500,000 $133,500,000
St. Clair County Concordia Church Road Beginning at a point approximately 250 feet West of intersection with Il Route 158. nce continuing West 0.87 miles to intersection with Frank Scott Parkway West. Roadway Reconstruction <79> $1,750,000 $2,014,500
St. Clair County Archview Drive Commencing at a point near intersection of I255 and Mousette Lane; nce continuing souasterly to Il Route 157. New 2-Lane Roadway <72> $4,020,800 $4,723,920
St. Clair County North Greenmount Road North Greenmount Road from 400 ft South of Route I-64 Eastbound ramps at North Greenmount Road/I-64 Interchange, Norrly 0.54 mile. Widening 3 to 5 Lanes <15> $1,493,613 $1,766,613
Washington Park Audubon Avenue Street Improvement Audubon Avenue (46th Street to Vassar Avenue) Roadway Improvements <80> $1,520,000 $1,520,000
Washington Park Hill Avenue Street Improvement Hill Avenue (Kingshighway Boulevard to Vassar Avenue) Roadway Improvements <80> $420,500 $420,500
Washington Park Vassar Avenue Street Improvement Vassar Avenue (Hill Avenue to Bunkum Road) Roadway Improvements <80> $2,850,000 $2,850,000
Tri-City Regional Port District and Madison County Levee Road Rehabilitation project begins at intersection of 20th Street and continues north to intersection of North Street for a total distance of 6,500 feet. Resurfacing 2 Lane Pvmt <21> $896,800 $896,800
Bethalto West Corbin Extension (Phase III) Beginning at west approach of SN: 060-6851 (Sta. 37+70.95) and terminating at IL 140/111 (Sta. 82+54.97). New 2-Lane Roadway <72> $5,000,000 $5,000,000
Cahokia Doris Avenue Resurfacing Doris Avenue from Range Lane to Jerome Lane Resurfacing 2 Lane Pvmt <21> $409,000 $409,000
East Alton St. Louis Avenue Roadway Improvements FAU Route 8980 From West Main St. easterly 4,910 ft. (0.93 miles) to Haller Ave. which is at Village limits.
Resurfacing <20> $1,905,000 $1,905,000
East Alton Main Street Improvements (FAU Route 8967) From St. Louis Avenue (FAU Route 8980) easterly 0.62 miles to Lakeside Avenue. Resurfacing <20> $1,095,500 $1,095,500
Fairmont City Mounds Heritage Trail/Fairmont City Street Improvements Starting at intersection of Collinville Rd. and Cookson Rd.,
East on Cookson Rd. 0.55 miles to N. 45th St.,
North on 45th St. 0.39 miles to Maryland Ave.,
East on Maryland Ave. 1.11 miles to N 63rd St.,
North on 63rd St. 0.50 miles to intersection with Collinsville Rd.
Preliminary Engineering <50> $2,774,762 $2,774,762
Glen Carbon Glen Carbon Road Pavement Preservation, Phase 1 Beginning at IL Route 157 eastward to S. Meridian Road intersection. Resurfacing 2 Lane Pvmt <21> $387,200 $387,200
Glen Carbon Glen Carbon Road Pavement Preservation, Phase 2 Beginning at S. Meridian Road intersection to approx. 150' north of Glen Crossing/Meridian Road intersection. Resurfacing 2 Lane Pvmt <21> $223,000 $223,000
Godfrey Crosstown Road-Phase 1 (FAU 8904) project is located in Godfrey in Madison County, Illinois. project begins at Airport Road/ Pierce Lane intersection and extends easterly to a point 673 feet east of US Route 67 (Godfrey Road) on Ill. Route 111 (Montclair Ave.) a total length of 8,890.07 feet or 1.68 miles. New 2-Lane Roadway <72> $750,000 $5,973,000
Godfrey Stamper Lane - Phase 2 (FAU 8950) From 900 feet west of Illinois Route 111/US Route 67 westerly for 2,100 feet (0.40 miles) to a point 3,950 feet (0.75 miles) east of Pierce Lane. Roadway Reconstruction <79> $800,000 $979,000
Hartford North Old St. Louis Road North Old St. Louis Road from Hawthorne St. north to Rand Ave., a total distance of 0.5 miles. Roadway Reconstruction <79> $354,500 $384,500
Maryville Lakeview Acres Phase 2 (F.A.U. Route 9114) project begins just south of intersection with Illinois Route 162 and continues south to termini of Phase 1, just north of Remington Lane. Roadway Reconstruction <79> $1,313,500 $1,313,500
Maryville Lakeview Acres Road Phase 3 (F.A.U. Route 9114) This project is located at intersection of Lakeview Acres Road and Illinois Route 162. Approximately 220' of improvements on both sides of intersection will be reconstructed along Lakeview Acres Road. Approximately 400' of improvements on both sides of intersection will be reconstructed along Illinois Route 162. Intersection Reconstruction <49> $1,164,200 $1,164,200
Pontoon Beach Pontoon Road Resurfacing Project (FAU Route 9082) 160 feet west of Breckenridge Lane easterly 2,837 feet or 0.54 miles to Illinois route 111 Resurfacing 3 Lane Pvmt <22> $279,500 $392,700
Shiloh Shiloh Station Road Improvements Shiloh Station Road, from Shiloh Main Street/Lebanon Avenue South for approximately 1.52 miles to Village limits. Project Map see Exhibit 1. Drainage Correction <82> $4,223,684 $4,223,684
Swansea IL Rte. 159 Pedestrian Way Improvements IL Rte. 159, from Fullerton Road (Colleen Drive-private drive) to West J Street (south city limit) Sidewalks <88> $554,927 $554,927
Swansea Fullerton Road Bi-directional Turn Lane Fullerton Road, from IL Rte. 159 to 2,000 feet west (at Metrolink overpass) Bi-directional Left-turn Lane <53> $771,000 $771,000
Swansea Huntwood Road Improvements-Phase 2 Huntwood Road, from Old Caseyville Road to IL Rte. 159 Roadway Reconstruction <79> $3,208,445 $3,208,445
Metro Phase I MetroLink Infrastructure Rehabilitation - Stations & Right-Of-Way East St. Louis, IL - St. Louis City, MO - St. Louis County, MO

Project map is attached.
Transit Capital Imps. <08> $12,000,000 $12,000,000
Cities of: Festus, Crystal City, Herculaneum, Pevely 4CRISP (4-Cities Road Improvement Stimulus Project) On north side Highway 61-67 from Highway Z, south to Interstate 55, also including Highway Z from Metropolitan Blvd. to Highway 61/67, and McNutt Road from I-55 to Highway 61/67. Add Auxilliary Lane <05> $0 $0
Ballwin Kehrs Mill Road Pavement Replacement Holloway Road to Clayton Road. Resurfacing 2 Lane Pvmt <21> $1,330,000 $1,330,000
Brentwood Litzsinger Road Rehabilitation limits of this project are Litzsinger Road in Brentwood, Missouri between McKnight Road and Brentwood Boulevard as shown in Appendix A. Resurfacing 2 Lane Pvmt <21> $1,150,000 $1,150,000
Bridgeton Fee Fee Road Improvement Project Fee Fee Road - Old St. Charles Rock Road to Ayrshire Drive

A project map will be submitted with supplemental information.
Roadway Reconstruction <79> $1,729,699 $1,863,675
Chesterfield Appalachian Trail Street Reconstruction - Phase I project is located on Appalachian Trail between Olive Boulevard and Beaver Creek Drive. Roadway Reconstruction <79> $986,425 $986,425
Chesterfield Appalachian Trail Street Reconstruction - Phase II project is located on Appalachian Trail between Beaver Creek Drive and White Road. Roadway Reconstruction <79> $1,089,490 $1,089,490
Chesterfield North Outer 40 Center Turn Laneproject is located on North Outer 40, just east of Spirit of St. Louis Boulevard, adjacent to Chesterfield Valley Athletic Complex. $0 $0
Chesterfield O live Street Road and Chesterfield Airport Road Improvements project is located at intersection of Olive Street Road and Chesterfield Airport Road. Roadway Improvements <80> $4,687,782 $4,687,782
Chesterfield Schoettler Valley Drive Street Reconstruction project is located on Schoettler Valley Drive between Highcroft and Chesterfield Parkway East. Roadway Reconstruction <79> $517,975 $517,975
Cool Valley South Florissant Road Streetscape Improvements South Florissant Road from Signal Hill north to City Limits Streetscape Improvements <02> $653,725 $653,725
Cottleville Gutermuth Realignment Gutermuth Realignment project is, what we consider, Phase III of St. Charles County - Gutermuth Reconstruction project. first phase is being constructed by St. Charles County, second phase has been designed and preparing to begin construction by St. Charles County, and third phase (realignment) is being designed at this time by Cottleville. realignment project is proposing a new widened and elevated alignment north from existing location of Gutermuth Road. See Appendix A for location map showing project limits. Roadway Realignment <71> $3,898,708 $3,898,708
Crestwood Spellman Road Corridor Improvements project will begin at intersection of Rayburn Avenue and Spellman Road, and will continue norrly to and including intersection of Pinellas Drive and Ponderosa Drive, n norrly to and including intersection of Acorn Drive and Oak Ridge, n to and including intersection with Oak Ridge and South Holmes Avenue, n to South Right of Way of Big Bend Road, where it will match existing pavement. This compliation of streets shall be known as Spellman Road Corridor Improvements, collectively. (See Appendix A - Project Location Maps) Roadway Reconstruction <79> $2,978,000 $2,978,000
Creve Coeur Olive Blvd. Phase II Improvements This project addresses various improvements from Olive/Mason Rd. to Olive/Old Ballas Rd. (see project location map) Widening <10> $6,146,750 $6,146,750
Creve Coeur Olive Boulevard Access Management and Safety Upgrades project includes relocation of Dautel Lane from Olive Boulevard to Greaser Acres as well as Olive Boulevard from just west of Schulte Road to just west of Deaver Lane/Chase Park Lane. Projects limits are graphically illustrated on Exhibit 1 within supplemental packet of information. Roadway Realignment <71> $3,137,943 $3,137,943
Crystal City 11th and Mississippi Road Improvements 11 Avenue … Missouri Avenue to Mississippi Avenue
Mississippi Avenue … 11th Avenue to 8th Avenue

A project map will be submitted with supplemental information.
Resurfacing <20> $1,334,631 $1,488,187
Crystal City Crystal City Heights Road Resurfacing Project Crystal City Heights Road - Missouri Avenue to Commercial Boulevard

A project map will be submitted with supplemental information.
Resurfacing <20> $411,980 $439,069
Dardenne Prairie Hanley Road Reconstruction This project is located north of Feise Road along Hanley Rd for about 2300 feet +/-.
(See Exhibit 1 in Appendix A.)
Roadway Reconstruction <79> $1,198,000 $1,198,000
Dardenne Prairie Post Road Intersection Realignment This project proposes to realign Post Road with Hanley Road at Highway N in St. Charles County, Missouri . See Appendix A for project location and layout. Roadway Realignment <71> $511,000 $511,000
De Soto De Soto Industrial Park See Attached $0 $0
Des Peres Highland Avenue Bridge Replacement over Sugar Creek (MoDOT #1145005) bridge is located on Highland Avenue approximately 0.20 miles south of Dougherty Ferry Road and 0.10 miles west of I-270. (See map). Replace Bridge(s) <33> $985,000 $985,000
DeSoto Amvets Drive Improvement Project Amvets Drive - Main Street to Hwy 21

A project map will be submitted with supplemental information.
Resurfacing <20> $940,524 $987,550
DeSoto Boyd Street Improvement Project Boyd Street - Main Street to N. Thomas Drive

A project map will be submitted with supplemental information.
Resurfacing <20> $1,393,384 $1,499,142
Edmundson Local Street Sidewalk Improvements Construct new sidewalks on folllowing City streets:
Holman, Mortimer, St. Girard, St. Jerome, Beauty, Traverse, Heath, Mill Pass, Treadway, Charm, Tanbark, Crilly, Dabney, and Dothan

See attached Exhibit 1 - Location Map. See Exhibits 2 and 3 for project details and Exhibit 4 for photos.
Pedestrian Facility <67> $100 $100
Ellisville Ellisville Street Improvement Projects re are four streets that will be improved. A project map is included with supplemental information that identifies four locations. four locations are 1) Hutchinson Road; Manchester Road to Clayton Road 2) Pierside Road; Old State Road to Kiefer Creek Road 3) Strecker Road; Manchester Road to north of SunnyRidge Road (Ellisville City Limits) and 4) Reinke Road; Manchester Road to south of Palm Bay Road. Resurfacing 2 Lane Pvmt <21> $1,348,184 $1,348,184
Eureka Eureka Alternative Transportation Improvements See Attached Maps. Transit Improvements <69> $1,774,800 $1,874,800
Eureka Eureka Overpass project location is in southwest quadrant of City, immediately south of Six Flags Road/I-44 Interchange. This project will begin on south side of interchange and extend south over all three sections of existing and relocated rail lines. exact location is shown in Appendix A. Bridge Removal <38> $14,000,000 $14,000,000
Fenton Gravois Road Improvements - Saline Road to Meramec River Bridge Gravois Road will be resurfaced from Saline Road to Meramec River Bridge, approximately 1.3 miles with modifications to two intersections.

project map is attached as Exhibit 1.
Resurfacing 5 Lane Pvmt <24> $1,145,000 $1,145,000
Fenton Larkin Williams and Yarnell Road Improvements project will extend along Yarnell Road from I-44 south to a location where Yarnell Road ties into Larkin Williams Road, n project continues on Larkin Williams Road to Highway 30.

project map is attached as Exhibit 1.
Resurfacing 3 Lane Pvmt <22> $2,908,000 $2,908,000
Fenton Old Highway 141 Resurfacing and Addition of Continuous, Two-Way Left Turn Lane and Shoulders Old Highway 141 will be improved for portion between Gravois Road and Gravois Bluffs Boulevard and this project covers 0.25 miles of that segment. This improvement includes roadway widening and addtion of a continuous two-way turn lane. A portion of road surrounding a bridge being replaced over Fenton Creek is excluded from this application.

project limits are shown on Exhibit 1.
Bi-directional Left-turn Lane <53> $407,415 $407,415
Fenton Roadway Concrete Slab Replacement - Fenton Industrial Complex slabs to be replaced are located in Fenton Industrial Complex.

project map is attached as Exhibit 1.
Roadway Improvements <80> $3,027,000 $3,027,000
Ferguson Sidewalk Replacement Project Ferguson Pedestrian Facility <67> $128,000 $128,000
Festus Central Avenue Road Improvement Project Central Avenue - N. Mill Street to Horine Road

A project map will be submitted with supplemental information.
Resurfacing <20> $888,027 $955,558
Gerald Flottmann Road This project consists of pavement repair, pavement overlay, and curb and gutter repair for a portion of Flottmann Road located in Gerald, Missouri. project length is approximately 1,456 feet long and begins at intersection of W. Industrial Drive and extends east to east entrance of Newly Weds Foods factory. (See Project Map) Resurfacing 2 Lane Pvmt <21> $51,290 $51,290
Gerald Haase Drive This project consists of pavement repair, pavement overlay, and new curb and gutter for entire length of Haase Drive located in Gerald, Missouri. street is approximately 550 feet long and begins at Missouri State Highway 50 and extends north to E. Industrial Drive. See attached Project Map (Exhibit "A") Resurfacing 2 Lane Pvmt <21> $61,615 $61,615
Gerald Industrial Drive This project consists of pavement repair, pavement overlay, and new curb and gutter for Industrial Drive located in Gerald, Missouri. street is approximately 4,545 feet long and begins at Haase Drive and extends west to Flottmann Road. See attached Project Map (Exhibit "A") Resurfacing 2 Lane Pvmt <21> $184,320 $184,320
Gerald Industrial Drive Extension This project consists of approximately 2,050 feet of new street construction that will connect Industrial drive to Missouri State Route 50. This connection will provide a loop through Industrial park and all residential areas intersecting Industrial drive. See attached Project Map (Exhibit "A") New 2-Lane Roadway <72> $572,875 $572,875
Hazelwood Burke City Phase 3 Former Burke City area of Hazelwood, bounded on east by Calverton Park, on north by Florissant, on south by Berkeleyand on west by Moran Drive. Resurfacing <20> $500,000 $500,000
Hazelwood Cedar Brooke Sidewalks Missouri Bottom Road & Leafcrest Drive on north, Tulip Tree Lane on west, Cherry Blossom Lane on east and Hwy 370 on south. Sidewalks <88> $575,000 $575,000
Hazelwood Concrete Slab Replacement City Wide Miscellaneous <90> $1,500,000 $1,500,000
Hazelwood Fee Fee Road Reconstruction From McDonnell Blvd. to Lambert Pointe Roadway Improvements <80> $1,300,000 $1,300,000
Hazelwood Frost-Byassee Connection From Eva Ave. in Berkeley to McDonnell Blvd. in Hazelwood New 2-Lane Roadway <72> $1,650,000 $1,650,000
Hazelwood Infill Sidewalks Bounded by Interstate 270 on south, Houdershell on west, Florissant city limits on north and east. Pedestrian Facility <67> $2,500,000 $2,500,000
Hazelwood Installation of Lighted Street Name Signs Along Lindbergh Blvd., McDonnell Blvd. and St. Louis Mills Blvd. Intersection Improvement <40> $200,000 $200,000
Hazelwood Railroad Bridge Replacement Lindbergh Blvd. at Hazelwood - Bridgeton city limits Replace Bridge(s) <33> $35,000,000 $35,000,000
Hazelwood Replace Interchange at Lindbergh Blvd. and Interstate 270 Lynn Haven on north, Utz Lane on south, 1000 feet from intersection on east and west Interchange Revision <96> $40,000,000 $40,000,000
Hazelwood Sidewalk Repairs City wide Pedestrian Facility <67> $300,000 $300,000
Hazelwood Street Reconstruction City wide Roadway Improvements <80> $2,000,000 $2,000,000
Herculaneum Brown Street Improvement Project Brown Street - Joachim Avenue to Main Street

A project map will be submitted with supplemental information.
Resurfacing <20> $959,405 $1,041,701
Hillsboro Old Highway 21 Road Improvement Project Old Highway 21 … Hwy B to Maple Street

A project map will be submitted with supplemental information.
Pedestrian Facility <67> $1,237,776 $1,317,623
Jennings College Avenue Street Replacement Removal and replacement 1685 linear feet of streets and curbs/gutters. Remove 630 linear feet of old sidewalk. Roadway Reconstruction <79> $700,000 $700,000
Jennings Cozens Avenue Street Replacement Removal and replacement 1360 linear feet of streets, curbs/gutters and sidewalks. Roadway Reconstruction <79> $600,000 $600,000
Jennings Emma Avenue Street Replacement Removal and replacement 1275 linear feet of streets, curbs/gutters and sidewalks. Roadway Reconstruction <79> $550,000 $550,000
Jennings Paratransit Replacement see attached map of city layout $85,000 $85,000
Kirkwood Kirkwood Street Infrastructure Project $0 $0
Ladue Ladue Pavement Rehabilitation McKnight Road from Clayton Road to Ladue Road
Litzsinger Road from Warson Road to McKnight Road
Old Warson Road from Warson Road to McKnight Road
Resurfacing 2 Lane Pvmt <21> $1,179,720 $1,179,720
Ladue Ladue Sidewalks and Walls $0 $0
Ladue Warson Road Improvements - Phase 2 Warson Rd. between Conway Rd. and Clayton Rd.

See supplemental information for location map.
Resurfacing 2 Lane Pvmt <21> $378,049 $378,049
Ladue Warson Road Improvements - Phase 3 Warson Rd/Woodlawn Ave. form Clayton Rd. to sourn City Limits

See supplemental information for project map.
Resurfacing 2 Lane Pvmt <21> $966,858 $966,858
Lake Saint Louis ARRA Overlay Program 2009 1. Ronald Reagan Drive from Green Tree Meadows Dr. to Lake Saint Louis Boulevard.
2. Lake Saint Louis Boulevard from Veterans Memorial Drive to Spillway Bridge.
3. Prospect Rd. from Corporate Parkway to Freymuth Rd.
Resurfacing <20> $500,911 $500,911
Manchester Asphalt street milling and overlay project See attached City map. Paving <83> $240,000 $240,000
Manchester Asphalt street milling and overlay project See attached City Map Paving <83> $280,000 $280,000
Manchester Concrete sidewalk replacement See attached City map. Pedestrian Facility <67> $90,000 $90,000
Manchester Concrete sidewalk replacement See attached City Map. Pedestrian Facility <67> $100,000 $100,000
Manchester Concrete street replacement See attached map. Roadway Improvements <80> $720,000 $720,000
Manchester Concrete street replacement See attached map Roadway Improvements <80> $760,000 $760,000
Manchester Schroeder Park storm sewer and drainage improvements. See attached city map. Culvert <57> $0 $0
Manchester Structural Rehabilitation of Bridges 6 Manchester owned and maintained bridges located within City limits. See attached map. Rehabilitate Bridges(s) < 32> $240,000 $240,000
Maplewood Maplewood Sidewlk Repair/Construction City-wide Sidewalks <88> $100 $100
Maryland Heights Concrete Street Reconstruction Pheasant Run (Charterwood-Dorsett), Wesglen Estates Drive (Wesco-Wesmeade), Donny Cave (Forestel Ct-North City Limits), Glenpeak Drive (Glenette-Glenlea), Glenette Drive (Glenlea-Glenpeak), Country Run Ct (Sar-end), Village Glen Ct (Sar-end), Villager Park Ct (Meadow Park Ct-End), Meadow Park Ct (Bennington-end), Glenmeade Dr (Dawn Hill-Glenbush), Glenbush Dr (Glenmeade-Roth Hill) Roadway Reconstruction <79> $2,900,000 $2,900,000
New Haven Miller Street Reconstruction Phase 2 Project involves reconstruction of Miller Street from intersection with Highway 100 north approximately 3,600 linear feet (.68 miles). Roadway Reconstruction <79> $2,070,981 $2,070,981
Normandy Natural Bridge Great Streets Project (Phase 1 Construction) See Attached Map Streetscape Improvements <02> $12,369,000 $12,369,000
O'Fallon, Mo. 2009 Resurfacing Project This project will provide a 2" overlay on following streets:
Route M (Main Street): Interstate 70 to north of Third Street (terminate at concrete)
East Pitman Street: Route M (Main Street) to Sonderen
Sonderen: Wabash Avenue to north of Interstate 70 (terminate at concrete)
Resurfacing <20> $670,000 $670,000
O'Fallon, Mo. Feise Road Bike Path Addition Feise Road, from Missouri Highway 'K' to Bryan Road; a distance of 2.25 miles. Currently Feise is a 3-lane road with sidewalks along south side. It serves primarily residential subdivisions and trailer parks throughout. Bicycle Facilities <58> $260,000 $260,000
O'Fallon, Mo. Highway 79 West Frontage Road Highway 79 is a Missouri State Highway that runs north-south adjacent to O'Fallon. Proposed western frontage road to Highway 79 would be from T.R. Hughes Blvd to Old Highway 79. $3,250,000 $3,250,000
O'Fallon, Mo. I-64 South Outer Road (Millennium Boulevard) Millennium Boulevard from Highway DD to Kent Drive: Millennium Boulevard will serve as outer road on south side of Interstate 64. project will provide a new four lane road that will connect Highway DD and Highway N. This project should relieve traffic between Winghaven & Hwy N interchanges on I-64 and create furr access to High-Tech corridor. New 4-Lane Roadway <73> $3,650,000 $8,200,000
O'Fallon, Mo. I-70 / Highway K Interchange I-70 / Highway K Interchange is main interchange on Interstate 70 within O'Fallon. interchange is severely congested and is in dire need of a revision. See attached location/concept map. Feasibility/Planning Study <56> $1,000,000 $1,000,000
O'Fallon, Mo. Main Street Traffic Signal Upgrades and Interconnect Main Street is a north/south street that starts at I-70. limits of this project are from West/East Terra to MO State Highway P; a total distance of 1.80 miles. Intersections as part of this application are as follows: West Terra, Pitman, Church, Elm, Third, St. Joseph, Tom Ginnever, and Highway P. Traffic Signals <42> $720,000 $720,000
O'Fallon, Mo. Veterans Memorial Parkway Widening Veterans Memorial Parkway is a minor arterial and is outer road on south side of Interstate 70. project extends from Highway K (exit 217) to Sonderen and will reconstruct and widen Veterans Memorial Parkway from two to three lanes. Widening 2 to 3 Lanes <12> $1,500,000 $1,500,000
O'Fallon, Mo. West Terra Widening (East of Bryan Road) West Terra is outer (service) road for I-70 along north side. section for this project will overlay and widen West Terra from North Central Drive to Bryan Road (exit 216 along I-70); a total distance of 0.4 miles. Widening <10> $501,000 $501,000
O'Fallon, Mo. West Terra Widening (West of Bryan Road) West Terra is outer (service) road for I-70 along north side. section for this project will overlay and widen West Terra from Bryan Road (exit 216 along I-70) to Lake St. Louis Blvd (exit 214 along I-70); a total distance of 2.06 miles. Widening <10> $2,060,000 $2,060,000
Pacific Congress Street Improvement Project Congress Street (Hwy N) - from 4th Street to Indian Trail Road

A project map showing project limits will be submitted with supplemental information.
Sidewalks <88> $1,396,764 $1,511,664
Pacific Denton Road Bridge Replacement Project Bridge along Denton Road, over Brush Creek, just south of W. Watson.

A project map showing project limits will be submitted with supplemental information.
Construct Bridge(s) <34> $963,676 $1,074,517
Pacific W. Osage Street Improvement Project W. Osage Street - from Indian Warpath Drive to N. 7th Street

A project map showing project limits will be submitted with supplemental information.
Pedestrian Facility <67> $782,500 $846,038
Pagedale Page Avenue Streetscape Improvements - Phase II Pennsylvania Avenue eastward to City Limits Streetscape Improvements <02> $1,727,728 $1,727,728
Richmond Heights Dale Avenue Great Streets Project Streetscape Improvements <02> $3,210,000 $3,210,000
Rock Hill & Glendale Bismark Avenue Improvements project extends westwardly from Rock Hill Road to Berry Road. portion maintained by Rock Hill extends from Rock Hill Road to Barron Lane. portion of Bismark maintained by Glendale extends from Barron Lane to Berry Road. Roadway Improvements <80> $2,788,052 $2,788,052
St. Ann Breckenridge Ave. Mill and Overlay Ashby Rd. to City Limits (east) Resurfacing 3 Lane Pvmt <22> $244,700 $244,700
St. Ann Breckenridge Ave. Mill and Overlay Ashby Rd. to City Limits (east) Resurfacing 3 Lane Pvmt <22> $244,700 $244,700
St. Charles Boschertown Road Phase I Boschertown Road: Foxhill Road to approximately 2100 feet north (by National Cart)
Foxhill Road: Intersection of Boschertown Road to 530 feet east
Roadway Reconstruction <79> $3,270,700 $3,270,700
St. Charles New Town Boulevard Reconstruction New Town Boulevard from 180 feet north of Elm Point Industrial Drive to 520 feet north of New Town Drive. Widening 2 to 3 Lanes <12> $4,625,000 $5,275,000
St. Charles South Main Street South South Main Street from 350 feet south of Ameristar Blvd to South River Road. Roadway Reconstruction <79> $3,865,180 $3,865,180
St. Clair Springfield Avenue Road Improvement Project Springfield Avenue - Main Street to City Limit

A project map will be submitted with supplemental information.
Resurfacing <20> $1,462,269 $1,911,759
St. Clair St. Clair Mo Route 30 Roadway Improvements This project consists of roadway and pedestrian improvements along Highway 30 between Bardot and High School Drive in St. Clair, Missouri. following exihibits are provided in Appendix A that provide greater depiction of project:
(see Appendix A - Exhibit 1 - "Projects Limits Map", Sheets 1-4 "Concept Plans" & "Engineer's Cost Estimate")
Bi-directional Left-turn Lane <53> $876,500 $1,105,000
St. Louis Bridge Maintenance and Management Plan … Off System Bridges All 24 St. Louis owned and maintained Off-System Bridges on local routes within City Limits. See attached map. Rehabilitate Bridges(s) < 32> $3,315,400 $4,325,000
St. Louis Bridge Maintenance and Management Plan … On System Bridges All 47 St. Louis owned and maintained On-System Bridges on federal Aid routes within City Limits. See attached map. Rehabilitate Bridges(s) < 32> $4,527,000 $8,475,000
St. Louis Carrie Avenue Improvements, N. Broadway to Hall Carrie Avenue from North Broadway Street to Hall Street Roadway Reconstruction <79> $3,000,724 $3,000,724
St. Louis Grand Boulevard Viaduct Reconstruction Grand Boulevard between Chouteau and I-64/US 40 ramps. Replace Bridge(s) <33> $4,780,000 $24,985,001
St. Louis Hall Street Improvements Hall Street, located in City's North Riverfront:
2.2 miles long, ROW mostly 120', some areas have 80' ROW
south end at East Grand (4600 Hall), north end at Gimblin (8400 Hall)
See attached maps and photos.
Drainage Correction <82> $9,317,879 $9,317,879
St. Louis Interstate 70 / Goodfellow Streetscape Improvements Goodfellow Boulevard between Interstate 70 and Natural Bridge Avenue Streetscape Improvements <02> $4,243,539 $4,243,539
St. Louis Loop Trolley Construction Delmar Boulevard, from Trinity Avenue in University City to DeBalievere Avenue, n south along DeBaliviere to Missouri History Museum Transit Capital Imps. <08> $40,000,000 $40,000,000
St. Louis North Sarah Street Improvements (Belle to Page) Intersection Improvement <40> $1,250,000 $1,250,000
St. Louis Reconstruction of Tucker Boulevard - O'Fallon to Cass This project extends along Tucker from its intersection with O'Fallon Ave through its intersection with Cass Ave, veering east through old Schnucks parking lot to align with proposed New Mississippi River Bridge St. Louis ramps.
approximate length along project is 1500 feet.
Geometric Revisions <46> $1,141,064 $6,245,064
St. Louis Reconstruction of Tucker Boulevard Bridge This project extends along Tucker from its intersection with Washington Avenue through its intersection with OFallon Ave, n veering east through old Schnucks parking lot to align with proposed New Mississippi River Bridge St. Louis ramps.
approximate length along project is 4000 feet. project will also extend down cross streets approximately 100 ft and encompasses Interco plaza, streets surrounding St. Patricks Center, and depressed area north of O
Bridge Removal <38> $27,146,000 $32,250,000
St. Louis Road Preservation and Pedestrian Improvements - Project "A" Project involves infrastructure improvements on following arterials as shown on Project Map included in Appendix:
Skinker Boulevard from Clayton Road to Page Boulevard (Principal Arterial)
Goodfellow Boulevard from Delmar Boulevard to Natural Bridge Avenue (Minor Arterial)
Broadway from Chouteau Avenue to Convention Plaza (Principal Arterial)
Fourth Street from Chouteau Avenue to Convention Plaza (Principal Arterial)
Resurfacing <20> $5,150,000 $5,150,000
St. Louis Road Preservation and Pedestrian Improvements - Project "B" Project involves infrastructure improvements on following arterials as shown on Project Map included in Appendix:
Grand Boulevard from Holly Hills Avenue To Natural Bridge Avenue (Principal Arterial)
North Florissant Avenue from Palm Street to Grand Boulevard (Minor Arterial)
Resurfacing <20> $6,300,000 $6,300,000
St. Louis Road Preservation and Pedestrian Improvements - Project "C" Project involves infrastructure improvements on following arterials as shown on Project Map included in Appendix:
Hampton Avenue from Gravois Avenue to I-64(Principal Arterial)
Vandeventer Avenue from Kingshighway Blvd. to Natural Bridge Avenue (Minor Arterial)
Washington Blvd. from Jefferson Avenue to Compton Avenue (Minor Arterial)
Resurfacing <20> $7,140,000 $7,140,000
St. Louis Traffic Signal Equipment Upgrades Project involves traffic signal equipment upgrades at approximately 160 intersections throughout St. Louis as shown on Project Map included in Appendix. Misc Traffic Control Items / ITS <55> $4,700,000 $4,700,000
St. Louis Wellington Avenue Bridge over River Des Peres Reconstruction Project begins on Wellinton Ave. at St. James Sq. and continues 813 feet with a bridge over River Des Peres terminating just north of Burlington Norrn Santa Fe Railroad bridge. Replace Bridge(s) <33> $6,550,000 $6,550,000
St. Louis Widening of Loughborough Bridge over Union Pacific Railroad This project involves construction along Loughborough Avenue at its intersection with Loughborough Drive and Loughborough Commons entrance to intersection with Southbound I-55 On/Off Ramps. Widening 3 to 5 Lanes <15> $831,032 $1,475,000
St. Louis Central Business District Streetscape Improvements Limits of Streetscape Improvements include following streets and related right-of-ways in downtown St. Louis:
- Tucker Blvd. from Washington Ave. south to Market Street
- 7th and 8th Streets from Washington Ave. south to Chestnut St.
- Olive and Locust Streets from Tucker Blvd. east to Broadway
Streetscape Improvements <02> $12,750,000 $12,750,000
St. Louis Gateway Mall Hallway As shown on attached map, Gateway Mall Hallway project extends along right-of-way of Market Street from Broadway on east to 22nd Street on west. Streetscape Improvements <02> $17,600,000 $17,600,000
St. Peters Grand Teton Drive Extension II Grand Teton Drive, from approximately 500 feet north of Mexico Road to Suemandy Drive. Roadway Reconstruction <79> $1,225,000 $1,225,000
St. Peters Jungermann Road Resurfacing III Jungermann Road, from Willott Road to McClay Road. Resurfacing 5 Lane Pvmt <24> $869,500 $869,500
St. Peters Mid Rivers Mall Drive Resurfacing II Mid Rivers Mall Drive, from Mexico Road to St. Peters-Howell Road. Resurfacing 5 Lane Pvmt <24> $907,000 $907,000
St. Peters Mid Rivers Mall Drive Traffic Signal Improvements Mid Rivers Mall Drive, from St. Peters-Cottleville Road to Cottleville Parkway. Traffic Signals <42> $321,900 $321,900
St. Peters Ohmes Road Resurfacing Ohmes Road, from Birdie Hills Road to St. Peters-Cottleville Road Resurfacing 3 Lane Pvmt <22> $607,500 $607,500
St. Peters Salt River Road - Spencer Road Intersection Realignment Spencer Road, from Elm Point Road to Highway 370 on ramp. Intersection Construction <48> $1,210,000 $1,210,000
St. Peters Salt River Road Extension Bridges Proposed Salt River Extension Road crossings of Dardenee Creek and Spencer Creek. Construct Bridge(s) <34> $4,322,200 $4,322,200
St. Peters Willott Road Bridge Replacement Willott Road crossing of Spencer Creek, just west of Del Ray Court. Replace Bridge(s) <33> $1,297,000 $1,297,000
St. Peters Willott Road Resurfacing Willott Road, from Mid Rivers Mall Drive to Kimberly Lane. Resurfacing 3 Lane Pvmt <22> $405,000 $405,000
Sullivan E. Vine Street Improvement Project - Phase 2 E. Vine Street … McKinley Street to Hughes Ford Road

A project map will be submitted with supplemental information.
Resurfacing <20> $766,676 $826,540
Sunset Hills West Watson & Rott Road Improvements West Watson Road, from Highway 30 to Rott Road and Rott Road between West Watson Road and Robyn Replace Bridge(s) <33> $1,191,690 $1,191,690
Sunset Hills West Watson Road Improvements West Watson Road, from Highway 30 to Rott Road and Rott Road between West Watson Road and I-270 Replace Bridge(s) <33> $0 $0
Sunset Hills $0 $0
Town & Country Clayton Road Pedestrian Enhancements Clayton Road from Mason Road to Woods Mill Road Pedestrian Facility <67> $230,000 $230,000
Union Alternates for Church Street Improvement Project Church Street - Hwy 50 to Independence Drive

A project map will be submitted with supplemental information.
Pedestrian Facility <67> $207,932 $207,932
Union Denmark Road Improvement Project Denmark Road - Progress Parkway to St. Andrews Drive

A project map will be submitted with supplemental information.
Resurfacing <20> $1,140,665 $1,236,375
Union Springfield Avenue Road Improvement Project Springfield Avenue - Independence Drive to Church Street

A project map will be submitted with supplemental information.
Resurfacing <20> $378,860 $412,957
University City Transportation Infraestructure Repair Project Several residential streets within limits of University City (map attached) Resurfacing <20> $1,900,000 $1,900,000
Velda City Velda City Streets Makeover Paving <83> $771,825 $771,825
Vinita Park Mid County Industrial Park Improvements on Page Ave. A map of project area will be submitted with or documentation on April 1, 2009. Left-turn Lanes <43> $1,256,658 $1,570,823
Washington Camp Street Bridge bridge will span Busch Creek on Camp Street, at approximate mid-point between East Rose Lane and Ninth Street.
Find a project map enclosed.
Construct Bridge(s) <34> $595,000 $595,000
Washington Resurfacing of Various Streets West Eighth Street, from Hwy 47 west to Stafford Street
West Main Street, from Tiemann Drive west to Westlink Drive
Grand Avevue, from Bernard Avenue south to Fifth Street
Pottery Road ( formerly Clay Street ), from Fifth Street south to Hwy 100
Old Highway 100, from Fifth Street east to city limits
Find a project map enclosed.
Resurfacing 2 Lane Pvmt <21> $935,000 $1,870,000
Washington $0 $0
Washington Mo Rte. 100 widening Phase III Section 1 beginning approx. 250' west of Mo. Rte.47 west to High St.
Section 2 High St. to Pottery Rd. (Clay St.)
Widening 2 to 5 Lanes <14> $15,700,390 $15,700,390
Webster Groves Bompart Avenue Resurfacing and Curb and Gutter Construction Bompart Avenue from Big Bend Blvd to Newport Avenue. Resurfacing 2 Lane Pvmt <21> $373,377 $373,377
Webster Groves Concrete Streets Improvement Project City Limits Roadway Reconstruction <79> $13,089,700 $13,089,700
Webster Groves E. Jackson Rd. Resurfacing and Curb and Gutter Construction E. Jackson Road from Edgar Road to Laclede Station Road Resurfacing 2 Lane Pvmt <21> $378,661 $378,661
Webster Groves E. Kirkham Avenue Resurfacing E. Kirkham Avenue between N. Elm Avenue and Thornton Avenue Resurfacing 4 Lane Pvmt <23> $222,935 $222,935
Webster Groves E. Lockwood Avenue Resurfacing E. Lockwood Avenue from Elm Avenue to Big Bend Boulevard Resurfacing <20> $430,537 $430,537
Webster Groves Marshall Avenue Resurfacing Marshall Avenue from Bompart Avenue to Big Bend Boulevard Resurfacing 2 Lane Pvmt <21> $261,607 $261,607
Webster Groves S. Rock Hill Road Resurfacing S. Rock Hill Road from W. Jackson Road to Big Bend Boulevard Resurfacing 2 Lane Pvmt <21> $137,645 $137,645
Webster Groves W. Kirkham Avenue Resurfacing W. Kirkham Avenue from N. Rock Hill Road west to City Limits Resurfacing 2 Lane Pvmt <21> $111,725 $111,725
Weldon Spring Independence Road and State Highway 94 Traffic Signal and Intersection Reconstruction Intersection of Independence Road and Highway 94 (see attached map) Traffic Signals <42> $1,151,314 $1,186,314
Weldon Spring Young Drive Extension and Widening Beckman Road to Siedentop Road (See attached map) New 2-Lane Roadway <72> $921,010 $966,010
Wentzville David Hoekel Parkway Beginning at Goodfellow Rd and running north approximately 2.25 miles adjacent to existing subdivisions and terminating at W. Meyer Rd. This project will also include reconstruction of approximately 1500 l.f. of Goodfellow Rd. and approximately 2900 l.f. of W. Meyer Rd to facilitate turn lanes and exit lanes from David Hoekel Parkway. This will be phase 1 of a multi-phase project. New Roadways <70> $11,360,600 $11,360,600
Wentzville Duello Rd Improvements-Callahan Rd to Prospect Rd project will begin at intersection of Callahan Rd and Highway 40/61, and extend souast to connect into proposed St. Charles County TIP project for Duello Rd and Prospect Rd realignment. Roadway Reconstruction <79> $2,685,600 $2,685,600
Wentzville Interstate Dr. Phase Three project will begin on west side of intersection of Interstate Dr. and Wilmer Rd connecting Wilmer Rd to Hepperman Rd. Interstate Dr. will be aligned and extended west .95 miles and terminate at Hepperman Rd. This is phase three of a multi phase project. New Roadways <70> $3,830,030 $3,830,030
Wentzville Mexico Rd Widening project will begin at newly reconstructed signaled intersection along MODOT State Route Highway A and extend north west to a tapered transition area approximately 200 foot northwest of a privately owned driveway designated High County Dr. Roadway Reconstruction <79> $4,300,694 $4,300,694
Wentzville Wentzville Parkway-William Dierber Dr. to Schroeder Creek Blvd project will begin at intersection of Wentzville Parkway and William Deirberg Dr. extending north and east to intersection of Wentzville Parkway and Schroeder Creek Blvd. It will include a signalized intersection at Great Oaks Blvd. Bi-directional Left-turn Lane <53> $1,598,497 $1,598,497
Wildwood Manchester Road Bike Lanes Both sides of Manchester Road, between Missouri Route 109 and Franklin County Line. Roadway Shoulders <89> $1,500,000 $1,500,000
East-West Gateway Council of Governments Greater St. Louis Public Transportation Educational Program project will reach entire East-West Gateway service area, however some elements such as direct mail and community out reach will be limited to areas Metro serves, St. Louis City, St. Louis County and St. Clair County. Education/Marketing Program <01> $1,995,000 $1,995,000
East-West Gateway Council of Governments Great Streets Demonstration Projects - Engineering Services maps showing limits of all four projects attached Traffic Calming/Access Mgt <03> $2,500,000 $2,500,000
Festus Special Road District Scenic Drive, County Road, and Cherry Lane Resurfacing Project Scenic Drive - Herculaneum South City Limit to Festus North City Limit
Cherry Lane - Hwy Z to County Road
County Road - Scenic Drive to Hwy Z

A project map will be submitted with supplemental information.
Resurfacing <20> $718,710 $753,146
Franklin County Bend Road Bridge Replacement Bend Road is a two-lane roadway with a one lane bridge crossing Meramec River south of Pacific. MoDOT currently maintains roadway, titled Route N, through Pacific, where it is classified as an Urban Collector. Franklin County takes ownership at approximately first curve (at bluff line just east of Meramec River) for approximately 2.5 miles where it n switches back to MoDOT as Route N. A majority of Bend Road within Franklin Countys jurisdiction lies within floodplain of Meramec River. See attached Project Map. Replace Bridge(s) <33> $12,100,000 $12,100,000
Franklin County New Hope Church Road Improvements, Bridges over Big and Little Indian Creeks This project involves replacing a deficient and removed Bridge #3100014 over Big Indian Creek, replacing a 30' span low water crossing at Little Indian Creek and approach road work to both creek crossings all on New Hope Church Road about one mile east of Missouri Route K and six (6) miles south of Missouri Route 30 and St. Clair, Missouri. Replace Bridge(s) <33> $1,095,700 $1,095,700
Franklin County Old Highway 100 Bridge F-408 Replacement Old Highway 100 Bridge (MoDOT Bridge No. 4330001) over Busch Creek. Lat. 38° 32' 25.68" N; Long. 90° 58' 26.43" W Franklin County Missouri. Replace Bridge(s) <33> $1,365,000 $1,365,000
Franklin County Overlay #1 Old Highway 100 begins at Washington City Limts and ends at Missouri Route AT. Old Highway 50 (East) begins at Union City Limits and ends at U.S. Route 50. Old Highway 50 (West) begins at U.S. Route 50 and ends at Missouri Route C. Paving <83> $2,082,264 $2,082,264
Jefferson County Antire Road Pavement Preservation Antire Road from High Ridge Boulevard to St. Louis County Line in Sections 3, 10, 14 & 15, T43N, R4E, in Jefferson County, Missouri. Resurfacing 2 Lane Pvmt <21> $262,000 $262,000
Jefferson County Flucom Road Overlay Flucom Road from US Highway 67 to DeSoto City Limits in Sections 5,6,8 and 9 of T39N, R5E and Sections 1 and 2 of T39N, R4E, Jefferson County, Missouri. Resurfacing 2 Lane Pvmt <21> $643,000 $643,000
Jefferson County Guardrail on Main Street @ Gravois (Northwest) Main Street in House Springs between Gravois (Northwest) and Mo Route MM Miscellaneous <90> $91,910 $91,910
Jefferson County Guardrail on Old Lemay Ferry Road Old Lemay Ferry Road south of MO Route M, between entrance/exit ramp to eastbound route M and Wedde Road. Miscellaneous <90> $125,160 $125,160
Jefferson County Guardrail on Vogel Road (North of Old Lemay Ferry Road) On Vogel Road (in Arnold area) between Old Lemay Ferry Road and Vogel Circle Miscellaneous <90> $67,200 $67,200
Jefferson County Klondike (South) Road Overlay Klondike (South) Road from Missouri Route E to McClain Street in Sections 10,15,16 and 21 of T39N, R4E, Jefferson County, Missouri. Resurfacing 2 Lane Pvmt <21> $600,000 $600,000
Jefferson County Konert Road Bridge Rehabilitation Konert Road Bridge # 0690001 over Romaine Creek In U.S. Survey 3011, T43N, R5E Jefferson County, Missouri. Rehabilitate Bridges(s) < 32> $894,000 $894,000
Jefferson County Lions Den Road Reconstruction-Phase 3 Lions Den Road from Living Well Foundation Camp Road (formerly Lions Den Camp Road) to Binning Road in Section 34, T43N, R5E, Jefferson County, Missouri. Roadway Improvements <80> $1,841,000 $3,445,131
Jefferson County Little Brennan Road Reconstruction Little Brennan Road on south side of Highway 30 in NE 1/4 of Section 7, T43N, R5E, Jefferson County, Missouri. Widening 2 to 3 Lanes <12> $444,000 $444,000
Jefferson County Montebello Road Pavement Preservation Is a part of US Surveys 2009, 2024, 2005, T42N, R6E, Jefferson County, Missouri.
Project length 1.352 miles from US Highway 61-67 to Kimmswick City Limits.
Resurfacing 2 Lane Pvmt <21> $88,565 $88,565
Jefferson County Old Sugar Creek Road South Overlay Old Sugar Creek Road between Diehl Road and West Rock Creek Road in Sections 17, 20 and 29, T43N, R5E Jefferson County Missouri. Resurfacing 2 Lane Pvmt <21> $794,000 $794,000
Jefferson County River Street Road Overlay River Street (County Road No. 235)- 0.22 miles long running from State Highway K to State Highway 61-67. Section 17, T42N, R6E, Jefferson County, Missouri. Resurfacing 2 Lane Pvmt <21> $119,500 $119,500
Jefferson County West Four Ridge Overlay West Four Ridge (County Road # 038)- 5.06 miles long running from Old Highway 21 to West Rock Creek Road. Resurfacing 2 Lane Pvmt <21> $1,700,855 $1,700,855
Franklin County, Union and Washington Mo. Rte. A (lane widening and shoulders) Mo. Rte. 47 (Union. Mo) to Chamber Dr. (Washington) length approx. 7.5 miles
Widening <10> $3,096,910 $3,096,910
Missouri Botanical Garden MBG Perimeter Improvements project is bordered by Shaw Blvd. on North, Magnolia Ave. on South, Tower Grove Ave. on East and Alfred Ave. on West. An additional corridor also extends along Shaw Blvd. from Alfred Ave. to S. Vandeventer Ave. and includes improvements along Vandevender Ave. from Shaw Blvd. to route 44. Streetscape Improvements <02> $2,170,000 $2,170,000
St. Charles County ADA Compliant Ramp Reconstruction Attached is a spreadsheet showing 936 sidewalk ramps that require modifications or replacement in order to meet current ADA standards. Pedestrian Facility <67> $850,000 $850,000
St. Charles County Asphalt Overlay - 2010 Guthrie Road: Mexico Road to Highway P
Vomund Road: Highway 79 to Highway Y
Seeburger Road: New Town Boulevard to Highway B
W. Meyer Road: Highway W to North Point Prairie
Resurfacing 2 Lane Pvmt <21> $148,000 $580,000
St. Charles County Asphalt Overlay #1 N. Point Prairie Road: I-70 North Outer Road to W. Meyer Road
Peine Road: Highway 61 to Somerset Manor
Pitman Hill Road: Greens Bottom Road to Windcastle
Diehr Road: Highway DD to 0.2 miles west of Willow Park Drive
Resurfacing 2 Lane Pvmt <21> $520,000 $520,000
St. Charles County Asphalt Overlay #2 Hackmann Road: St. Paul Road to Highway 79
Parr Road: Highway A to Highway P
Resurfacing 2 Lane Pvmt <21> $430,000 $430,000
St. Charles County Asphalt Overlay #3 Pralle Lane: Jackson Place to Old South River Road
Boschertown Road: Highway B to Fox Hill Road
Resurfacing 2 Lane Pvmt <21> $500,000 $500,000
St. Charles County Bridge Deck Replacement Bridge 03200061 on Josephville Road over a Tributary to Cuivre River
Bridge 0560002 on St. Paul Road over a Tributary to Peruque Creek
Bridge 35900161 on Femme Osage Creek Road over a Tributary to Femme Osage Creek
Bridge 36100011 on Cappeln Osage Road over a Tributary to Femme Osage Creek
Bridge Deck Repair <31> $205,000 $235,000
St. Charles County Diamond Grind Kisker Road: Highway 94 to Pitman Hill Road
Laura Hill Road: Highway K to Knaust Road
Jungs Station Road: Highway 94 to Amhurst Place
Roadway Improvements <80> $800,000 $800,000
St. Charles County Duello Road, Phase 1 Reconstruction From planned interchange at Highway 40/61 (I-64) west along Prospect Road to Duello Road n south to Bridge over Peruque Creek. Roadway Reconstruction <79> $1,080,000 $3,761,000
St. Charles County Duello Road, Phase 3 Reallignment From western90-degree turn north of Highway N, along a new alignment due south to Highway N. Roadway Realignment <71> $1,344,000 $3,045,000
St. Charles County Duello Road, Phase 4 Intersection Realignment intersection of Duello Road and Highway N Intersection Improvement <40> $300,000 $510,000
St. Charles County Ehlmann Road Zumbehl Road and Shady Oak Drive Roadway Reconstruction <79> $385,000 $2,593,000
St. Charles County Femme Osage Creek Road Bridge Replacement Bridge over Tributary of Femme Osage Creek located approximately 0.8 miles east of Highway T. Replace Bridge(s) <33> $85,000 $491,000
St. Charles County Greens Bottom Road, Phase 3 Reconstruction From Pitman Hill Road to Amrein Road Roadway Reconstruction <79> $500,000 $500,000
St. Charles County Gutermuth Road, Phase 2 Reconstruction From Morhead Road to east of Tealwood Drive Roadway Realignment <71> $840,000 $2,900,000
St. Charles County Guthrie Road Bridge Replacement Bridge over unnamed tributary to Peruque Creek located approximately 0.5 miles north of Mexico Road. Replace Bridge(s) <33> $125,000 $685,000
St. Charles County I-70 Reliever Route, Phase 1 Reconstruction From Dardenne Creek along Highway C n along Salt River Road to Brown Road Roadway Reconstruction <79> $471,000 $3,300,000
St. Charles County I-70 Reliever Route, Phase 2 Reconstruction From Arrowhead Industrial Boulevard to Brown Road Roadway Reconstruction <79> $852,000 $2,730,000
St. Charles County Interstate Drive From Highway Z along a new alignment to Quail Ridge Parkway New 2-Lane Roadway <72> $3,000,000 $3,860,000
St. Charles County McClay Road Reconstruction From Thoele Road to St. Peters-Howell Road Roadway Reconstruction <79> $1,240,000 $3,870,000
St. Charles County Pitman Road and Highway A Connection Connecting Highway A to Pitman Road with loop road. Intersection Construction <48> $750,000 $1,000,000
St. Charles County Seal Coat Dingledine Road: Towers Road to Southgate
Caulks Hill Road: Harvester Road to Towers Road
St. Paul Road: Highway Y to Highway P
Patriotic Trail: Wolfrum Road to Independence Road
N. Point Prairie Road: W. Meyer Road to Highway 61
Resurfacing 2 Lane Pvmt <21> $600,000 $600,000
St. Charles County Thoele Road Reconstruction From McClay Road to Spring Wood Drive Roadway Reconstruction <79> $800,000 $2,485,000
St. Charles County Wolfrum Culvert Replacement On Wolfrum Road 0.23 miles east of Patriotic Trail over an unnamed tributary to Missouri River. Culvert <57> $300,000 $300,000
St. Louis County Old State Road "B" 300' south of Pierside Lane to Old State Spur

This project will create 45 jobs during construction.
Widening 3 to 5 Lanes <15> $8,800,000 $8,800,000
St. Louis County Barrett Station Road Dougherty Ferry Road to Manchester Road (MO Route 100). It includes westbound Dougherty Ferry Road to northbound Barrett Station Road right turn lane.
This project includes additional mill and overlay projects. Thirtyfive jobs will be created at Barrett Station Road. Each additional location will create between 20 and 35 jobs. Approximately 10 - 12 jobs will be created at materials processing facilities.
Roadway-Curb & Gutter <86> $5,100,000 $5,100,000
St. Louis County Baxter Road Improvement Project - Completing Baxter Road Corridor Parkway West Middle School to Hearcroft Drive Widening 2 to 3 Lanes <12> $7,500,000 $7,500,000
St. Louis County Core Arterial Road Rehabilitation with Green Construction Materials See Exhibit A and Exhibit B. Project maps are included in back-up materials and show locations of infrastructure improvements sites: Airport Road - James S. McDonnell Blvd to I-170, James S. McDonnell Boulevard - Natural Bridge Rd to Air Cargo Rd and Berkely Rd to Lindbergh Blvd, Warson Road/Ashby Road - Olive Blvd to Page Ave, Sappington Road - Big Bend Rd to Gravois Rd, Midland Boulevard - Delmar Blvd to 100 feet south of Canton, Mason Road - Manchester Rd to Conway Rd, and Mattis Road - Worthington Dr to Little Rock Rd. This project will create up to 257 jobs. Resurfacing 5 Lane Pvmt <24> $7,575,570 $7,575,570
St. Louis County Intelligent Transportation System - County Wide This project will improve our Intelligent Transportation System (ITS) system countywide. Exhibit B has a list of specific sites. Misc Traffic Control Items / ITS <55> $16,500,000 $16,500,000
St. Louis County Route 141 Missing Link - Finish 141: Page to Olive Connector Page to Olive Connector is one of last pieces to be completed in central part of Highway 141 to Earth City Expressway corridor. Page to Olive Connector begins at intersection of proposed Relocated Route 141 and Olive Boulevard. project extends north to recently opened extension of Maryland Heights Expressway (MHE)at Waterworks Road. From that point north, Page to Olive Connector includes addition of lanes to existing two lane section of MHE. This continues until it joins four-lane section of MHE at River Valley Drive. New 4-Lane Expressway <78> $75,000,000 $75,000,000
St. Louis County Scudder Road Access Improvements Hanley Road to I-170 Intersection Improvement <40> $0 $0
St. Louis County South County Connector at Hanley and Manchester project includes reconstruction of intersection of Hanley Road, a County operated arterial and Missouri Route 100, a State operated arterial. project limits extend from intersection of Hanley Road and Litszinger Road, north of Manchester Road to intersection of Hanley Road and Flora Avenue, south of Manchester Road. This project will result in creation of 2170 jobs. Additional jobs will be created as proposed development projects are implemented. Intersection Reconstruction <49> $33,305,500 $50,305,500
St. Louis County Union Road Extension Linbergh Blvd. to Lemay Ferry Road, opposite I255 off-ramp. New Roadways <70> $0 $0
Bellefontaine Neighbors Overlay of Belgrove Drive, St. Cyr & Coburb Lands Drive Belgrove Drive - Bellfontaine Road to Lilac Road
St. Cyr - West City Limits to East City Limits
Coburb Lands Drive - Bellfonatine Road to Chambers Road
Resurfacing 2 Lane Pvmt <21> $1,109,190 $1,109,190
Bellefontaine Neighbors St. Cyr Bridge Replacement project limits will extend approximately 100 feet each side of bridge to reconstruct approach pavement. Replace Bridge(s) <33> $920,568 $920,568
Bellefontaine Neighbors Reconstruction of Shepley Drive $0 $0
Bellefontaine Neighbors Reconstruction of Shepley Road Bellefontaine Road east to Lilac. Roadway Reconstruction <79> $1,954,103 $1,954,103
Berkeley Airport Road and Bridge Improvements project limits extend east along Airport Road, beginning east of James S McDonnell Blvd. and ending east of Interstate 170. This project includes bridge complex at interchange of Interstate 170 over Airport Road and exit ramps from Interstate 170. (Refer to Exhibit -1) Resurfacing 5 Lane Pvmt <24> $3,211,900 $3,211,900
Berkeley Street Improvements of Evergreen, January and Alder Evergreen: January South to City Limits
January: Alder to East of City Limits
Alder: Frost Avenue to Evergreen
Resurfacing 2 Lane Pvmt <21> $1,098,156 $1,098,156
Ferguson Church Street Improvements Elizabeth Ave. to Florissant rd Paving <83> $526,563 $526,563
Ferguson Forestwood Avenue Reconstruction From intersection of Ferguson Avenue and Forestwood Avenue north to Chambers Road (approx. 4,700 ft.) Roadway Reconstruction <79> $2,987,059 $2,987,059
Frontenac Spoede Conway Improvements project limits are from intersection of Spoede Road and Clayton Road approximately 1 mile North to City Limits and from intersection of Conway Road and S. Lindbergh Blvd. approximately 1 mile West to City Limits.

Please see attached project map.
Pedestrian Facility <67> $2,327,157 $2,327,157
Northwoods Lillian Avenue Improvements Highway 70 South Outer Road from City Limits to City Limits. Resurfacing <20> $741,816 $741,816
Shrewsbury Street Improvements (Overlay / Slab Replacement) of Weil, Kennrick,Trianon and Parkway Weil ave.- From Shrewsbury ave to east city limits
Kenridge/Trianon Parkway- From LaClede Station to Watson
Resurfacing <20> $737,093 $737,093
Valley Park St. Louis Avenue Improvements $0 $0
Vinita Park Industrial Park Street Improvements Crystal Industrial, Delport, Mid County, Chapen Industrial and Bodine. Resurfacing 2 Lane Pvmt <21> $837,743 $837,743
University of Missouri - St. Louis Natural Bridge Great Streets Project (Phase 2 Construction) Streetscape Improvements <02> $7,647,733 $7,647,733
Washington Special Road District WSRD - Bethlehem Church Road Resurfacing Resurfacing Bethlehem Road from Bieker Road to N. Goodes Mill Road. Resurfacing project will consist of approximately 1.2 miles. Project is within Franklin County and is south of Washington, MO. See site map. Resurfacing 2 Lane Pvmt <21> $132,796 $165,995
Washington Special Road District WSRD - Bieker Road Resurfacing Resurface approximately 4.0 miles of Bieker Road from Washington City limits to Bethlehem Church Road. This project is within Franklin County. A portion of Bieker Road route to be resurfaced has a speed limit of 35 MPH and a portion has a speed limit of 40 MPH. See attached site map. Resurfacing 2 Lane Pvmt <21> $437,953 $547,441
Washington Special Road District WSRD - Bieker Road Widening Widen and incorporate or safety improvements along approximately 1.5 miles of Bieker Road. Project will start at Bethlehem Church Road and continue north to that portion of Bieker Road that was previously widened in 2008. Project is within Franklin County. See attached project location map. Widening <10> $174,394 $217,993
Washington Special Road District WSRD - Mealer Lane Resurfacing Resurface project will consist of approximately 1.5 miles. Project is within Franklin County and is west of Washington, MO. See site map. Resurfacing 2 Lane Pvmt <21> $139,368 $174,210
Washington Special Road District WSRD - North Goodes Mill Road Resurfacing and Safety Improvements Resurface N. Goodes Mill Road from South Point Road to Bethlehem Church Road, in Franklin County. Project will also include reconstruction of road over an unnamed tributary to DuBois Creek. Total project length is approximately 2.0 miles. See location map. Resurfacing 2 Lane Pvmt <21> $270,991 $338,739
Bi-State Development Agency (d.b.a. Metro) Phase I MetroLink Infrastructure Rehabilitation - Bridges and Tunnels St. Louis, MO
St. Louis County, MO
St. Clair County, IL
Metro Link Improvements <87> $19,000,000 $19,000,000
Columbia Quarry Road/ Old IL-3 Intersection Improvements proposed work is on north leg (Old IL-3), south leg (Ghent Road), and west leg (Quarry Road) of intersection of Quarry Road and Old IL-3/ Ghent Road. $397,000 $397,000
Highland US Route 40 / Hemlock Street Intersection Improvements From approximately 1500' west of Hemlock Street to approximately 1200' east of Hemlock Street on US Route 40. $470,000 $515,000
O'Fallon Seven Hills Road @ State Street/Vincennes Road - Roundabout Intersection Improvement Intersection of Seven Hills Road ((FAU 9172) and State Street/Vincennes Road (FAU 9164) in O'Fallon, Illinois (St. Clair County). See attached location map. $750,000 $750,000
Madison County Mass Transit District Direct Mid-Day Regional Connector N/A $1,290,000 $1,290,000
Madison County Mass Transit District Eastport Park and Ride Service N/A $750,000 $750,000
Madison County Mass Transit District IL 157/159 Express Corridor Replacement Buses N/A $1,500,000 $1,500,000
Madison County Mass Transit District IL 157/159 Express Corridor Service Expansion N/A $1,875,000 $1,875,000
Madison County Mass Transit District IL 3 Express Corridor Replacement Buses N/A $750,000 $750,000
Madison County Mass Transit District IL 3 Express Corridor Service Expansion N/A $2,250,000 $2,250,000
Madison County Mass Transit District MCT Bike Share Program N/A $525,000 $525,000
Madison County Mass Transit District St. Louis County Mobility Initiative $1,103,375 $1,103,375
Madison County Mass Transit District Transit Parking and Pedestrian Crossing Facilities, Edwardsville IL $2,800,000 $4,800,000
Madison County Mass Transit District US 40 Express Corridor Replacement Buses N/A $1,500,000 $1,500,000
Madison County Mass Transit District US 40 Express Corridor Service Expansion N/A $750,000 $750,000
Metro East Park and Recreation District Confluence Bikeway Central Trail - McKinley Bridge to Malcolm W. Martin Memorial Park project starts approximately 1000 feet north of McKinley Bridge at termination of McKinley Bridge Bikeway and Confluence Bikeway North Trail, traverses south parallel and on top of Mississippi River Levee until it reaches Front Street in East St. Louis, Illinois. From this point it runs south on Front Street under Martin Lur King and Eads Bridge to its termination at Malcolm W. Martin Memorial Park in East St. Louis, Illinois. $1,128,600 $1,128,600
Metro East Park and Recreation District MEPRD - Troy Scott - Southwestern Illinois College (SWIC) Bikeway project starts at Interstate 55/70 near Wilson Heights Road on abandoned Illinois Terminal railroad right-of-way. project follows Illinois Terminal abandoned railroad right-of-way to State Street in O'Fallon, Illinois. From this location project heads souast and north of Shiloh, crossing Illinois Route 158 to Shiloh Metrolink Station. bikeway n heads south and n west crossing under Illinois Route 158 and n runs southwesterly crossing Illinois Route 161 and terminating at Southwestern Illinois College Belleville Campus. $12,000,000 $12,000,000
St. Clair County Transit District St. Clair County Community OUtreach Program St. Clair County, IL $300,000 $300,000
Sauget Curtiss Steinberg Intersection Improvement From intersection of Curtis Steinberg Road and Sauget Industrial Parkway, along Curtis Steinberg Road 500 feet west, along Sauget Industrial Drive 500 feet North, along Mark Allen Drive 500 feet east, along Vector Drive 300 feet south. $1,194,700 $1,194,700
Metro New and Expanded MetroBus Service St. Louis, MO
St. Louis County, MO
$27,807,081 $27,807,081
Arnold Intersection of Missouri State Road and Astra Way: Intersection Control Upgrade See Attachment 1, final sent to Jason Lange by email 2/13/09 from Shawn White (CBB) $1,013,000 $1,254,900
Berkeley Berkeley Bus Station and Pedestrian Bike Way Airport Road to Maline Creek. $874,924 $874,924
Brentwood Rose Avenue Pedestrian Improvements Project Rose Avenue from Brentwood Boulevard to Brentwood Promenade Court (see Appendix A). $150,000 $150,000
Cottleville Brittany Cove Drive/HwyN - Traffic Signal project is an installation of a new traffic signal along Hwy N at intersection of Brittany Cove Drive/Hwy N/Country Ridge Drive. Cottleville has taken responsibility of Hwy N at this location; refore, MoDOT approval is not needed for this project. Please see Appendix A for location map. $180,000 $180,000
O'Fallon Route M (Main Street) Traffic Signal Upgrades and Interconnect Route M (Main Street) is a north/south street that starts at I-70. This project will upgrade signals and provide an interconnection from West/East Terra to MO State Highway P; a total distance of 1.80 miles. Intersections as part of this application are as follows: West Terra, Pitman, Church, Elm, Third, St. Joseph, Tom Ginnever, and Highway P. $839,000 $839,000
Olivette Old Bonhomme Boulevard Street Improvements See Attached Map $1,165,000 $1,165,000
Olivette Old Bonhomme Road Reconstruction See Attached Map $15,850,000 $15,850,000
Rock Hill Intersection Improvements at Rock Hill Road and Brownbert Lane, Steger School and Lithia Avenue project is located on Rock Hill Road and will address intersections of Brownbert Lane, Steger School (entrance) and Lithia Avenue which are located in close proximity to one anor.

See Exhibit 1: Proposed Improvements
See Exhibit 2: Project Location Map
$313,000 $313,000
St. Charles Elm Street Widening Elm Street from Highway 370 south to Elm Point Industrial Drive $1,200,000 $1,200,000
St. Charles Fifth Street Corridor Phase II This project is located on Fifth Street between First Capitol Drive and Tompkins Street. $520,000 $520,000
St. Charles I-70 and 5th Street Fifth Street from I-70 overpass to just north of intersection with Ameristar Blvd. and approximately 550 feet of ramp from westbound I-70 to northbound Fifth Street. $1,100,000 $1,400,000
St. Charles $0 $0
St. Louis Delmar Boulevard - Signal Interconnection and Upgrades Delmar Boulevard from Vandeventer Avenue to City Limits (west of Skinker Boulevard). This project addresses 18 signalized intersections including interconnection, signal hardware upgrades, and pedestrian accessibility improvements along Delmar Boulevard corridor. See Attachment A for Project Location Map. $3,475,000 $3,475,000
St. Louis Goodfellow Boulevard - Signal Interconnection and Upgrades Goodfellow Boulevard from Lilian Avenue to Delmar Boulevard. This project addresses 18 signalized intersections including interconnection, signal hardware upgrades, and pedestrian accessibility improvements along Goodfellow Boulevard corridor. See Attachment A for Project Location Map. $3,950,000 $3,950,000
St. Louis Morgan Ford Road - Signal Interconnection and Upgrades Morgan Ford Road from Arsenal Street to City Limits (south of River Des Peres Boulevard). This project addresses 11 signalized intersections including interconnection, signal hardware upgrades, and pedestrian accessibility improvements along Morgan Ford Road corridor. See Attachment A for Project Location Map. $2,450,000 $2,450,000
Wildwood Route 100 Pedestrian/Bicycle Bridge at Earton Road Route 100 at Earton Road $900,000 $900,000
Forest Park Forever Forest Park Wayfinding Signage See Exhibit 1 $0 $0
Missouri Department of Transportation Franklin County Signals and ITS Route 100: Rt M to Southpointe
Route 50: I-44 to Rt 47 East
Routes 100 & 47: Washington area
Routes 50& 47: Union area
I-44 Bussiness Loop: Pacific area
$3,003,756 $3,003,756
Missouri Department of Transportation Intersection Improvements at US 67 and I-270 Southbound US 67 ramp to I-270 from Candle Light Lane to I-270 and US 67 ramp split. $363,000 $363,000
Missouri Department of Transportation MO 100 Signals and ITS MO 100 from McKnight to MO 109 $2,056,984 $2,056,984
Missouri Department of Transportation MO 30 Signal Upgrade and ITS MO 30 from Routes B & NN to River Des Peres $1,929,551 $1,929,551
Missouri Department of Transportation Signal System Optimization Several signal corridors in St. Louis County area. $361,200 $361,200
Missouri Department of Transportation US61-67 Signal System and ITS US61-67 from MO 267 (Lemay Ferry) to MO 110 $3,796,551 $3,796,551
Missouri Department of Transportation Westbound I-70 Auxiliary Lane - Eastern Section Westbound I-70 auxiliary lane from TR Hughes Blvd off-ramp to TR Hughes Blvd on-ramp $800,000 $800,000
Missouri Department of Transportation Westbound I-70 Auxiliary Lane - Western Section Westbound I-70 auxiliary lane from 1700-feet west of TR Hughes Blvd to 925-feet east of Route K bridge $1,276,000 $1,276,000
St. Charles County Coordinated Traffic Signal Closed Loop System Improvements Six locations within Saint Charles County. Please see attached map with ir locations indicated on it. $280,000 $280,000
St. Charles County Incandescent bulb conversion to Light Emitting Diode (LED) for Traffic Signals & Street Lights Fourteen locations within Saint Charles County. Please see attached map with ir locations indicated on it. $95,000 $95,000
St. Charles County St. Peters-Howell and McClay Traffic Signal Intersection of St. Peters-Howell Road and McClay Road. interconnect air waves between this intersection and proposed traffic signal installation at Central Elementary School entrance across from Toelle Road will be utilized to create a closed loop coordinated system. $31,200 $171,000
St. Charles County St. Peters-Howell and Toelle Traffic Signal Intersection of St. Peters-Howell Road, Central Elementary School entrance and Toelle Road. nearby intersection of St. Peters-Howell and Central School Road would also be improved by this project. Its controller assembly will receive a new controller for compatibility with this closed loop coordinated system, a wireless radio for interconnect communications and licensed copy of manufacturer's closed loop system software to be used by St. Peters. No antennas will be required at se two controller cabinets due to ir proximity and line of site. $40,600 $218,000
St. Louis County Intelligent Transportation System - Countywide See
Exhibit A - Map
Exhibit B - List of sites
Exhibit C - Functional Classification of site roads
$16,500,000 $16,500,000
]
 